1) setup time
安装时间
1.
Single machine group scheduling with resources dependent setup time;
安装时间受资源约束的单机成组调度问题
2.
The objective function is to minimize total resource consumption of setup time and jobs under makespan constrains.
讨论了安装时间和加工时间同时受资源约束的单机成组排序问题。
3.
In this model, the setup time of a group is a strictly decreasing function of the amount of resources consumed, and the processing time of a job is a strictly increasing linear function of its starting time.
在这一模型中,工件组的安装时间是所消耗资源的非负严格减少连续函数,工件的加工时间是开工时间的严格增加函数。
2) Setup Times
安装时间
1.
Single machine group scheduling problem with setup times;
一类带有安装时间的单机成组排序问题
4) set-up time
建立时间,安装时间
5) erecting bay
安装间
1.
With three dimensional finite element method, the author analysed and calculated the stress of the dam section with erecting bay in the Zuojiang water resources pivotal project.
利用三维有限元法分析计算了左江水利枢纽安装间坝段的应力。
6) installing distance
安装间距
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条