说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 固废库坝
1)  embankment for blocking solid reject
固废库坝
1.
The geotubes converting the contaminated material into the usable resources when they are used to construct the embankment for blocking solid reject and the analysis of its stability are elaborated in this article.
阐述了储淤管袋作为固废库坝的资源化利用及其运行稳定性分析,对比了数值模拟与基于极限平衡原理的计算结果,得出一些有益的结论。
2)  solid radioactive waste store
固体放射性废物贮存库
3)  active waste building
固体废物贮存库;放射性废物厂房
4)  Solid waste
固废
1.
On the System of Integrated Management for Municipal Solid Waste in Wuxi New District;
无锡新区城市生活固废的一体化管理体系研究
2.
The technique of preparation of SiO2·nH2O from a solid waste, fly ash,was studied generally.
初步探讨了用工业固废粉煤灰制备白炭黑的方法。
5)  Infiltration-protection of dams of reservoirs
库坝防渗
6)  reservoir dam
水库大坝
1.
Introduction on emergency preparedness plan of reservoir dam safety management;
水库大坝安全管理应急预案浅谈
2.
Quality control of consolidation project of Xiaohekou reservoir dam in Yicheng;
翼城小河口水库大坝加高培厚工程中的质量控制
3.
Influence of 5·12 earthquake on Fengjiashan reservoir dam;
浅析“5·12”地震对冯家山水库大坝的影响
补充资料:巴库拉多坝

巴库拉多坝

Bacurato Dam


概  述

  巴库拉多坝又名古斯塔沃迪亚斯总统(Presidente Gustavo Dias)坝,位于墨西哥锡那罗亚(Sinaloa)河上,心墙堆石坝,最大坝高115m,水库总库容29亿m3,电站总装机10万kW。工程主要用以灌溉(11.2万hm2)防洪和发电。
  坝址处为非对称的狭谷,左岸陡峻,右岸较缓。河面宽200m,河床覆盖层厚12m,多为卵石与砂的透镜体。两岸地质不同,左岸主要是凝灰岩、角砾岩、辉绿岩组成的火成岩体,右岸则为变质岩,包括片岩、板岩和片麻岩。坝址控制流域面积7299km2,年平均径流量13.28亿m3,最大流量6991m3/s。水库最高水位252.50m,面积76km2,有效库容16.1亿m3
  工程主要建筑物包括大坝、厂房、溢洪道等。
  心墙堆石坝坝顶高程256.00m,,坝顶长810m,顶宽10m,上下游坝坡均为1∶2.0,心墙上下游侧均设有反滤层,心墙坡度均为1∶0.2。坝壳是采用当地的卵石、砂和块石来填筑,并以抛石护坡。大坝体积720万m3。在左岸山谷垭口处还修建有一座副坝,高24m,长240m。
  溢洪道位于左岸,为反弧形控制溢洪道,长65m,堰顶水头15.44m。进口设5扇13m×16m的弧形闸门,设计最大流量7410m3/s,泄流陡槽末端设有挑流鼻坎,其高程为204m。灌溉引水洞也布置在左岸,设计引用流量100m3/s。电站厂房布置在右岸,总装机10万kW。
  大坝施工时,河床覆盖层分区挖掉,心墙建在完好岩石上,两岸挖至新鲜基岩,帷幕灌浆深度60m,心墙基础进行固结灌浆,孔深10m。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
坝库工程  水库坝基  拦泥库坝  库坝群  石坝水库 
  ©2011 dictall.com