1) forced shut-down
强迫停机
1.
4 in one power plant,namely sliding-parameter shut-down and forced shut-down,the influence of two shut-down processes upon rotor s life expenditure of the steam turbine has been analysed in detail,pointing out that the forced shut-down affects more greatly the rotor s life and the safety of boiler,and it is not advocate.
通过某电厂4号汽轮机组滑参数停机和强迫停机不同过程的热力参数及其变化速率、转子热应力、应变和寿命损耗的比较,分析了两种停机工况对汽轮机转子寿命损耗的影响,指出强迫停机对转子寿命和锅炉的安全均影响较大,不提倡采用。
2) forced outage rate
强迫停机率
3) forced outage ratio
强迫停机比
4) FOR (forced outage rate)
强迫停运率,强迫停机率
5) equivalent forced outage rate
当量强迫停机率
6) forced outage
事故停用,强迫停机,强制停机
补充资料:采用强夯法进行机场停机坪软土地基加固
采用强夯法进行机场停机坪软土地基加固
采用强夯法进行机场停机坪软土地基加固 I
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条