1) non-source flood
无源淹没
1.
In the floods submerged analysis,there are two different cases,the so-called "non-source flood"and"source flood",for determining flood area based on DEM and under the given water level condition.
在地形图数字化基础上,分别对有源淹没和无源淹没进行分析,并运用ArcMap和ArcView软件自身的功能,对洪水淹没面积进行统计计算,并以2003年渭河下游洪水淹没数据为依据进行对比验证,取得了良好的效果。
2.
In the mining subsidence area,the paper calculates the submerged area by the non-source flood analysis,and proposes the analysis of submerged area under the condition of water-level.
在采煤塌陷区范围内,该研究采用无源淹没分析法,给出了给定水位条件下的塌陷区水域淹没分析方法,计算出各年份采煤塌陷区的水域淹没范围。
2) source flood
有源淹没
1.
In the floods submerged analysis,there are two different cases,the so-called "non-source flood"and"source flood",for determining flood area based on DEM and under the given water level condition.
在地形图数字化基础上,分别对有源淹没和无源淹没进行分析,并运用ArcMap和ArcView软件自身的功能,对洪水淹没面积进行统计计算,并以2003年渭河下游洪水淹没数据为依据进行对比验证,取得了良好的效果。
2.
There are two different cases in flood simulation,the so-called "source flood" and "non-source flood".
洪水淹没模拟分为有源淹没和无源淹没两种情形,针对有源淹没的递归算法占用计算机资源较多,容易造成系统堆栈溢出,导致程序崩溃等缺陷,文中提出了一种计算洪水有源淹没范围算法:堆栈节点遍历算法。
3) submergence
[英][səb'mə:dʒəns] [美][səb'mɝdʒəns]
淹没
1.
This paper presents the experiential study on casingcutting with abrasive water jet under conditions of nonsubmergence, submergence and ambient pressure.
针对石油工程生产需要,在非淹没、淹没以及有围压存在的条件下,对磨料射流切割油井套管进行了实验研究。
4) inundation
[英][,inʌn'deiʃən] [美][,ɪnʌn'deʃən]
淹没
1.
②The size and inundation of the reservoir can be expounded and proved through economic benefits.
②水库规模与淹没问题,应通过经济论证。
5) flood
[英][flʌd] [美][flʌd]
淹没
1.
A New DEM-based Method for Flood Area Calculation and Damage Evaluation;
一种基于数字高程模型DEM的淹没区灾害评估方法
2.
Based on grid of DEM, we take the lower reaches of Weihe flood data as a basis, and combined with Virtual GIS module of ERDAS 8.
基于数字高程模型的栅格结构,以渭河下游洪水淹没数据为基础,依据无源淹没和有源淹没的原理,并结合ERDAS8。
3.
Correct flood simulation of intertidal zone is crucial to marine applications such as coastal management and anti-flood.
此文针对传统算法的不足,提出了一种顾及高水位影响的潮滩淹没动态仿真算法。
6) submerged
[英][səb'mə:dʒd] [美][səb'mɝdʒd]
淹没
1.
2-D depth-averaged model for flows in river with submerged groins;
天然河道淹没丁坝群水深平均平面二维数学模型研究
2.
Simulation study of organ pipe nozzle submerged water jet;
风琴管喷嘴淹没射流流场仿真研究
3.
The submerged tunnel is simulated by the Elastic-Plastic FEM to analyse its influence on the environment.
为了分析淹没坑道对环境的影响,采用弹塑性有限元法对被淹没的坑道进行了数值计算,分析了不同情况坑道衬砌及围岩的破坏变形情况,同时提出了相应的加固方案,并对拟采用的不同方案加固效果进行了模拟分析,分析结果表明所提出的加固方案可行。
补充资料:水库淹没界线测量
测设移民线、土地征用线、土地利用线、水库清理线等各种水库淹没、防护、利用界线工作的总称。这些界线以设计正常蓄水位为基础,结合浸没、坍岸、风浪影响等因素综合确定,根据需要测设其中的一种、几种或全部。测设时,用界桩在实地标出其通过的位置并绘在适当比例尺的地形图上,作为移民规划、迁移安置及库区建设的依据。界桩分为永久桩和临时桩两类。界线通过厂矿区或居民点时,在进出处各设一个永久桩,内部每隔若干米测设一个临时桩,主要街道标出界线通过的实际位置。大片农田及经济价值较高的林区,一般每隔2~3km测设一个永久桩,再以临时桩加密到能互相通视。只有少量庄稼的山地,可只测设临时桩显示界线通过的位置。经查勘确定不予利用的永久冻土地、大片沼泽地、陡峭坡地等经济价值很低的地区,可不测设界桩。界桩测设工作由测量人员配合水库设计人员和地方、移民等有关单位协同进行,用水准仪或经纬仪分段按设计高程在实地标定,随测随将界桩及标志移交地方保管。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条