1) man-made three-phase earthing short circuit experimentation
人工三相接地短路试验
2) artificial three phases ground tests
人工三相短路试验
3) single-phase short-circuit simulation
人工单相短路试验
4) three-phase short-circuit test
三相短路试验
5) artificial single-phase grounding test
人工单相接地试验
1.
Aiming at the phenomenen of Spark Gap System Self-Triggering during the artificial single-phase grounding test on the MOV of Hechi fixed series compensation(FSC) device,this paper analyzes the cause of the phenomenen based on the functional principles of the spark gap system.
针对河池串补MOV在人工单相接地试验中火花间隙系自触发启动现象,基于河池串补火花间隙的工作原理,对串补装置火花间隙自触发进行分析和检测验证。
6) artificial single phase to ground test
单相人工接地试验
1.
The testing data mainly comes from the artificial single phase to ground tests and the one phase of the switch open test.
通过工频过电压分析和特高压试验示范工程系统调试期间实测数据的分析,根据2次单相人工接地试验和单开关空载运行单相偷跳的试验结果校核了高抗中性点及小电抗绝缘水平,可供后续特高压交流工程参考。
补充资料:接地短路器
用于将电路接地的一种机械式开关电器。接地短路器通常装在降压变压器的高压侧,当用电端发生故障,但故障电流不很大,不足以使送电端的断路器动作时,接地短路器能自动合闸,造成人为接地扩大故障电流,使送电端断路器动作而分闸,切断故障电流。
接地短路器的结构形式有单极、双极和三极。单极只用于中性点接地系统;双极和三极用于中性点不接地系统,用一个操动机构联动。
图中所示为110千伏电压等级用的接地短路器。分闸时用手推动操动机构,使短路闸刀打开,同时使合闸弹簧压缩贮能;合闸时,操动机构脱扣,在合闸弹簧的作用下,短路闸刀快速合闸。
接地短路器的结构形式有单极、双极和三极。单极只用于中性点接地系统;双极和三极用于中性点不接地系统,用一个操动机构联动。
图中所示为110千伏电压等级用的接地短路器。分闸时用手推动操动机构,使短路闸刀打开,同时使合闸弹簧压缩贮能;合闸时,操动机构脱扣,在合闸弹簧的作用下,短路闸刀快速合闸。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。