1) boiler main control
锅炉主控
3) main boiler
主锅炉
1.
The operation of a marine main boiler is characterized by a very high frequency of load changes, and often by a sizable margin at that.
舰船主锅炉运行时负荷变化频繁 ,且变化幅度大。
2.
This paper dwells on the matching of a power plant and its main boiler as well as their interrelationship.
论述动力装置与主锅炉的匹配及其相互关系,可作为舰船蒸汽动力装置和舰船主锅炉的设计参考资料。
3.
From a total of ten aspects,including reliability,economy,weight and dimensions as well as maneuvrability,listed are the major technical requirements of a large sized power plant to a naval main boiler.
从可靠性、重量尺寸、经济性、机动性等十个方面介绍大功率动力装置对舰船主锅炉的技术要求。
4) port main boiler
左主锅炉
5) boiler control
锅炉控制
1.
The design of the boiler control system based on PLC and VVVF;
基于PLC和变频调速的供暖锅炉控制系统设计
2.
Study on Boiler Control Based on Artificial Neural Networks;
基于人工神经网络的锅炉控制研究
3.
On the base crucial question in CFB boiler control is analyzed in detail.
在此基础上,详细分析了CFB锅炉控制中的几个主要关键问题。
6) automatic control of boiler
锅炉自控
补充资料:50t炼钢电弧炉总降压变电所SVC主控室(大冶钢厂)
50t炼钢电弧炉总降压变电所SVC主控室(大冶钢厂)
容 50t炼钢电弧炉总降压变电所SVC主控室(大冶钢厂)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条