1) anchor hole of main action rope
工作主索锚洞
1.
On the basis of waterfall Channel Bridge,it analyses and calculates the design of the main action rope,the saddle and anchor hole of main action rope,and tractive rope at length,and introduces the operating principle of the main bearing rope of swinging cable loop wheel machine,gives a certain reference value to the similar bridge construction.
以瀑布沟大桥为背景,对工作主索、工作主索锚洞、工作主索索鞍、牵引索的设计进行了详细的分析计算,并介绍了吊运缆索吊机承重主索的工作原理,对类似桥梁的施工具有一定的参考价值。
2) main anchor rope
主锚索
1.
This paper focused on the distribution of main anchor rope inside gate pile and sub-major anchor rope inside bearing beam in the gate room with structure of both side gate piles connected with bearing beam.
本文主要研究了小浪底工程排沙洞出口用支承梁连接两侧闸墩的问室结构中,闸墩内主锚索和支承梁内次锚索的布置型式和束数。
3) anchorage cable engineering
锚索工程
4) anchor construction
锚索施工
1.
Landslide′s control with minipiles in the course of anchor construction;
锚索施工过程中微型桩对滑坡的治理
5) ship rigger
锚泊索具工
6) fish
[英][fɪʃ] [美][fɪʃ]
吊锚工作
补充资料:边坡预应力锚索加固
边坡预应力锚索加固
1262
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条