2) secondary girder pre-stressed
次梁预应力
1.
The project has used large-span secondary girder pre-stressed ceiling structure,which effectively reduces the beam cross-section height and ensures the total height and building height requirements.
工程中采用了大跨度次梁预应力楼盖结构,有效地降低梁的截面高度,确保层高和建筑物总高度的要求,此外还采用了超长混凝土结构无缝设计等新技术。
3) long-span prestressed girder
大跨预应力次梁
1.
The reasonable economics of the floor system including a framing of long-span prestressed girders are minutely analysed according to the investigatory statistics and analytical comparison between this floor system and general floor system designed with regular practice.
根据几类已建工程的调查统计、分析对比,对与传统设计手法不同的大跨预应力次梁楼盖结构体系的经济合理性做了详细分析,结果表明这种体系方案合理,综合经济效果显著。
5) the Long-span Pre-stressed Concrete Hypo-beam
大跨度预应力次梁
1.
The Test Analysis on the Comprehensive Seismic Resistant Behaviors of the Long-span Pre-stressed Concrete Hypo-beam Floor System;
大跨度预应力次梁楼盖结构体系抗震性能试验研究
6) twice-prestressed composite beam
2次预应力组合梁
补充资料:行次田家澳梁作
【诗文】:
田家俯长道,邀我避炎氛。当暑日方昼,高天无片云。
桑间禾黍气,柳下牛羊群。野雀栖空屋,晨昏不复闻。
前登澳梁坂,极望温泉分。逆旅方三舍,西山犹未曛。
【注释】:
【出处】:
全唐诗:卷137_9
田家俯长道,邀我避炎氛。当暑日方昼,高天无片云。
桑间禾黍气,柳下牛羊群。野雀栖空屋,晨昏不复闻。
前登澳梁坂,极望温泉分。逆旅方三舍,西山犹未曛。
【注释】:
【出处】:
全唐诗:卷137_9
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条