1) large pumped storage power plant
大型抽水蓄能电站
1.
The status in quo of monitoring and control systems of large pumped storage power plants is discussed.
讨论了大型抽水蓄能电站监控系统的现状,分析了现有系统的优缺点;介绍了国网南京自动化研究院自主创新、具有完全知识产权的MB80型智能可编程控制器;针对大型抽水蓄能电站控制的特点,讨论了国产化系统需研究的关键技术;最后介绍了以MB80为核心控制平台的大型抽水蓄能电站计算机监控系统。
2) pumped-storage hydroelectric plant
抽水蓄能水电站
3) pumped storage power station
抽水蓄能电站
1.
Research on preloading filling spiral case structure in large pumped storage power station;
大型抽水蓄能电站充水保压蜗壳结构分析
2.
Study of three-part electricity price with consideration of dynamic assistant service of pumped storage power stations;
考虑抽水蓄能电站动态辅助服务的三部制电价研究
3.
The Application of KKS Identification System in Tai an Pumped Storage Power Station;
KKS标识系统在泰安抽水蓄能电站的应用
4) pumped-storage power station
抽水蓄能电站
1.
3-D numerical simulation of seepage in the upper reservoir of the Pushihe pumped-storage power station;
蒲石河抽水蓄能电站上库三维渗流数值模拟
2.
All-round simulation training systems for pumped-storage power stations;
抽水蓄能电站全范围仿真培训系统
3.
Price mechanims and operation modes for current pumped-storage power stations;
现有抽水蓄能电站电价机制及经营模式的探究
5) pumped storage plant
抽水蓄能电站
1.
Study on self-excited vibration of hydro-mechanical system in pumped storage plants;
抽水蓄能电站水力-机械系统自激振动特性研究
2.
Numerical simulation of trash rack for a pumped storage plant;
抽水蓄能电站进/出水口拦污栅数值模拟
3.
3-D numerical simulation on the vertical pipe outlet of pumped storage plant;
抽水蓄能电站竖井式出水口三维数据模拟
6) pumped storage power plant
抽水蓄能电站
1.
Some discussions about operational modes of pumped storage power plants under the electric power market;
电力市场环境下抽水蓄能电站经营模式的探索
2.
Operation modes of pumped storage power plant and the economic benefit analysis of power network;
抽水蓄能电站运行方式和电网经济效益分析
3.
The electricity benefits of pumped storage power plant;
抽水蓄能电站的电量效益
补充资料:巴斯康蒂抽水蓄能电站
巴斯康蒂抽水蓄能电站 Bath County Pumped Storage Power Station 位于美国弗吉尼亚州西北部,20世纪80年代是世界上装机容量最大的抽水蓄能电站。装机容量210万千瓦。厂房为半地下式,发电设计水头329米,抽水设计扬程335米,抽水最大流量 116米3/秒。上水库土石坝最大坝高140米 ,坝顶长731米。总库容4400万米3。下水库土石坝最大坝高41米,坝顶长690米,总库容3760万米 3。引水系统包括岸坡式取水口、引水平洞、竖井、压力隧洞、压力钢管和调压井等 。工程于1975年开工,1985年投产。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条