说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预防维修周期
1)  preventive maintenance period
预防维修周期
1.
The paper takes into full consideration the fact that the preventive maintenance period of a system changes as its maintenance times vary,and establishes a preventive maintenance period optimization model.
充分考虑到系统预防维修周期随维修次数的变化情况,建立了系统预防性维修周期优化模型,该模型还考虑到预防维修可以提高系统生产效益的同时,其故障率会随着维修次数的增加而上升,引入役龄回退因子对预防维修活动前后系统性能的动态变化进行了描述。
2.
This paper discusses fuzzy decision making method about preventive maintenance period for renewal type.
探讨了更新型预防维修周期的模糊决策方法,并结合航空工程实例进行了验证,证实了这种方法的可行
2)  equivalent-cycle preventive maintenance
等周期预防维修
1.
Then,by using the pro-bability theory,a spare part demand model of exponential life-type units is established for the equivalent-cycle preventive maintenance.
影响多部件系统备件订货策略的因素较多,为此将多部件系统预防维修的备件需求分为两种:随机失效部件的更换需求和预防维修时隐患部件的更换需求,在等周期预防维修下,应用概率理论,建立了指数寿命型部件的备件需求模型;在此基础上,以系统役龄内备件的订货、仓储总成本为优化目标,订货次数为优化变量,给出存在备件初始库存和订货提前期时的两种订货策略和策略模型的Visual Fortran仿真优化算法;最后结合算例,求得经济订货次数和策略以及相应的订货、仓储总成本。
3)  optimal preventive maintenance cycle
最佳预防维修周期
1.
Under a given availability, the model can achieve an optimal preventive maintenance cycle with a minimum total ave-rage cost.
一个复杂系统通常由多个不同部件组成,考虑到这些部件有各自不同的失效率及维修时间,本文提出了一种新的维修策略模型,该模型考虑了不同部件的差异性及对系统的不同重要性,在一定可用度要求下,使系统总平均费用达到最小的最佳预防维修周期,并给出了相应的仿真算法。
4)  periodic preventive maintenance
周期预防维护
5)  Maintenance period
维修周期
1.
The model of optimum maintenance period about full mechanized face equipment based on the rule of minimum running expenditure;
基于运行费用最小原则的综机设备最佳维修周期的优化模型
2.
The change of preventive maintenance period followed maintenance times was considered.
考虑到预防维修可以提高系统生产效益的同时,故障率会随着维修次数的增加而上升,引入役龄回退因子对预防维修活动前后系统性能的动态变化进行描述;而且还充分考虑到系统预防维修周期随维修次数的变化情况,建立了系统预防维修周期优化模型,并将改进后的遗传算法运用于模型的优化求解。
3.
This paper focuses on the characteristics of maintenance manner for the prime parts of passenger train and puts forward a deciding rule of optimum maintenance period for them.
从客车关键零部件维修方式的特点出发,提出了客车关键零部件最佳维修周期的确定准则。
6)  maintenance cycle
维修周期
1.
Determining parts maintenance cycle by using mathematical statistics;
应用数理统计方法确定设备零部件的维修周期
2.
Policy Decision Method of Road Machinery Economic Life and Maintenance Cycle;
筑路机械经济寿命和维修周期的决策方法
3.
The result shows that the way of optimum maintenance cycle is determined through achieving critical wear quantity of equipment.
并推出了通过求出设备的临界磨损量来确定最佳维修周期的方法,以此减少设备的维修费用。
补充资料:不合格品预防措施(见预防措施)


不合格品预防措施(见预防措施)
preventive actions for nonconforming product: see preventive actions

buh6g6Pi阅YUfong cuoshi不合格品预防措施Co刊rorrni鳍p耐uet)(preventive actions fornon-见预防措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条