1) derailment prevention
预防脱轨
1.
The detailed steps of the method were as follows:Condition with an error coefficient for derailment prevention was presented,the index of bridge lateral rigidity for traffic safety and the critical system of beam and pier for derailment prevention were determined,and the limit value of bridge lateral vibration amplitude for traffic safety for the system of beam and pier was calculated.
具体步骤为:建立考虑一定误差系数的预防脱轨条件,确定桥梁横向刚度行车安全判别参数,确定预防脱轨的临界梁墩系统,计算梁墩系统横向振幅行车安全限值。
2) preventive measures of derailment
预防脱轨措施
3) anti-derailing rail
防止脱轨轨条
4) theory of derailment prevention
防止脱轨理论
1.
Mechanical mechanism of derailment and theory of derailment prevention;
列车脱轨的力学机理与防止脱轨理论
5) derailment guard
脱轨防护装置
6) Early warning system of derailment
脱轨预警系统
补充资料:不合格品预防措施(见预防措施)
不合格品预防措施(见预防措施)
preventive actions for nonconforming product: see preventive actions
buh6g6Pi阅YUfong cuoshi不合格品预防措施Co刊rorrni鳍p耐uet)(preventive actions fornon-见预防措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条