1)  concrete-cored DCM pile
加芯搅拌桩
1.
The method for settlement of a concrete-cored DCM pile in layered ground;
层状地基中加芯搅拌桩的沉降计算方法
2.
Research on load transfer mechanism of concrete-cored DCM pile;
加芯搅拌桩荷载传递机理的研究
2)  cement mixing method
搅拌桩加固
1.
Researches on excavation deformation caused by cement mixing method outside excavation;
坑外搅拌桩加固对基坑变形的影响分析
3)  reinforced deep soil-mixing pile
加筋深层搅拌桩
4)  mixing pile pre-reinforcing
搅拌桩预加固
5)  concrete-cored DCM pile
混凝土芯水泥土搅拌桩
1.
It is proved that concrete-cored DCM pile has many advantages such as simple construction, little environmental disturbance, high bearing capacity, small settlement, low costs, and extensive adaptability in deep excavation engineering.
介绍了一种新型的基坑支护形式,即混凝土芯水泥土搅拌桩,它是一种融合了复合地基和桩基础优点的地基处理方法,是一种结合围护挡土结构和防渗止水帷幕功能于一体的支扩结构。
6)  concrete cored DCM pile
砼芯水泥土搅拌桩
1.
A new kind of composite pile, named concrete cored DCM pile is used in soft ground engineering.
介绍了适用于软土地基的一种新型复合桩———砼芯水泥土搅拌桩的设计和施工工艺 ,并在上海、江阴两地试桩和实际工程应用的基础上 ,分析了该桩竖向承载力的发挥机理、破坏模式和极限承载力。
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。