说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 模板体系
1)  formwork system
模板体系
1.
Optimization of formwork system of cast-in-place concrete for major structure of high-rise building;
高层建筑主体结构现浇混凝土模板体系的选择
2.
In this article,authors show the construction process of inclined beams,especially the formwork system and construction methods.
本文总结了斜梁的施工过程,重点介绍斜梁模板体系及施工方法。
3.
Integral steel platform formwork system is a new kind of formwork system adapting the construction need of super high rise buildings.
整体钢平台模板体系是适应超高层建筑主体施工需要的新型模板体系,通过建立有限元模型,对整体钢平台模板体系的动力特性进行了详细分析,得到了其自振频率和振型,其相关结论可以为模板体系的设计和施工借鉴。
2)  form system
模板体系
1.
This paper introduces the processing of the and laminated bamboo plywood form system and its consolidation service, and emphatically expounds the practice of the joints in detail, which includes the type selection of the forms and the supports and the arrangement of the forms, and puts forward some matters needing attention in the construction.
介绍了覆膜竹胶板全木模板体系的加工及拼装工艺,着重介绍了细部节点做法,包括模板及支撑选型、模板配置,提出了施工注意事项。
2.
There are slab-beam form system,flat-slab brace sys-tem,variable radius form system,light form system,cylinder form system,manual assembled form system,heat insulation form system and etc.
美国的现浇混凝土模板大致分为板梁式模板体系、平板支撑体系、可变半径模板体系、轻型模板体系、圆柱模板体系、手工组装模板体系和保温模板体系等。
3.
Several new form systems have been applied in the construction of the National Theatre.
国家大剧院工程施工中应用了多项新的模板体系
3)  follow board system
模板体系
1.
Key points in the design of the high strut follow board system;
高支撑模板体系设计重点考虑的因素
2.
It analyzes the characteristics and application dimension of every follow board system,represents the design idea of compound plastic inside lining follow board,discusses its composition and construction technique,and generalizes the related matters need attention in application,which will meet the purpose of increasing the integral firmness of structure.
分析了各种模板体系的特点及应用范围,阐述了塑料复合内衬模板的设计构想,论述了其组成以及施工工艺,总结了应用中的有关注意事项,达到提高结构整体耐久性的目的。
4)  template system
模板体系
1.
The chain-up template system which was designed in combination with engineering has been successfully resolved the problem.
结合工程实例,介绍了马水河特大桥高墩施工中链升式模板体系的设计技术。
5)  formwork system of top plate
顶板模板体系
6)  formwork frame system
模板框架体系
1.
In accordance with Sanjintan Sewage Treatment project in Wuhan, this paper figures out design for the formwork frame system of the egg-shaped digesters and meanwhile, makes simulation analysis on the data during the process of the construction works.
文章结合武汉三金潭污水处理工程,对卵形消化池模板框架体系进行了设计,并对施工过程分阶段进行了数值模拟分析,根据分析结果对模板框架体系和施工过程的控制措施进行了优化,其结论可供同类工程参考。
补充资料:NC模板
简介

CimatronE 为了加速编程过程和自动化各种操作,使用了各种类型的模板。这篇文章就是描述如何创建 NC 模板和如何使用模板以节省编程时间。


内容


什么是NC模板?


如何使用NC模板来提高工作效率?


如何加载和保存NC模板?


NC模板保存在什么地方?


什么是NC模板?


NC模板就是包含NC程序和它相关的用于创建刀路的参数。应用模板可以节省时间和编程过程标准化或刀路轨迹生成自动化。


如何使用NC模板来提高工作效率?


NC模板有多种使用方法,但事先需将典型的NC程序或刀路轨迹保存为模板,遇到具有相同或相似编程工艺的零件时就可以直接套用NC模板。


如何加载和保存NC模板 ?


加载:当在一个NC文件里,从菜单栏的加工-工具/模板/应用调用你所需要的模板称为加载。


注意,如果在程序管理器窗口里已经选中了一个程序,你只能选择程序模板。你选择的程序模板将被插入到你之前选择的程序之后。自然的,如果模板是基于规则选取了几何,那么模板选择的几何类型将被应用到当前程序里。


如果先程序管理器窗口中已经选中了一个刀路轨迹,系统会允许你选择任何类型的模板。选中的程序模板或刀路轨迹模板将被创建在你选中的刀路轨迹文件之后。


另外在编程时我们可以应用模板修改一个已经存在的程序或刀路轨迹。意思是程序里定义的参数也将被模板的参数覆盖掉。要实现该功能,转到 菜单栏的加工-工具/模板/修改或右键弹出菜单/应用 模板。但是,可选用的模板要由我们在程序管理器里选用的程序来决定,就是用来修改程序的模板必须要与被修改程序类型相同。



保存:


任何加工的刀路轨迹或程序都可以保存成加工模板。要保存模板,在程序管理器里选择你要想保存成模板的程序或刀路轨迹,然后转到菜单栏的加工-工具/模板/保存或右键弹出菜单保存模板。系统将保存你选择的程序或刀路轨迹和它们所包含的参数。如果程序包含通过规则选取的几何,那些选择也将被保存。如果有.JPG图片保存在相同的文件夹,图片可以在加工模板浏览器里显示。图片的名字必须与模板的名字相似,例如 (Template name: 1_FULL-3X-TP.tpt; Picture name: 1_FULL-3X-TP_tpt.jpg). 图片大小应该为 189 像素 宽 X 236 像素高 。


说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条