说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 沉沙
1)  desanding [di:'sændiŋ]
沉沙
1.
On flood control aspect,it has three functions of flood,detention and desanding,especially the function of desanding can slow down the rising speed of the river bed.
滩区在黄河防洪方面具有行洪、滞洪、沉沙3种功能,尤其是沉沙作用可减缓河床的抬升速度。
2.
The floodplain on the lower Yellow River is of an important place for flood channel,flood detention,desanding and 1.
黄河下游滩区是行洪、滞洪、沉沙和180余万人生活的重要场所,滩区治理模式受到人们广泛关注。
2)  sediment subsiding
泥沙沉降
1.
The influence of sediment subsiding on the index of the reservoir eutrophication;
泥沙沉降对水库富营养化指标的影响
3)  sediment basin
沉沙池
1.
Experiment study of flow s adjusting with flow board in sediment basin;
沉沙池中调流板对水流调节作用的试验研究
2.
It is pointed out that adopting reservoir instead of sediment basin is feasible.
通过试验表明以水库代替沉沙池是可行的。
4)  aeolian deposits
风沙沉积
1.
Grain-size characteristics of aeolian deposits in the shelterbelt of railway at Shapotou;
沙坡头铁路防护体系内风沙沉积的粒度特征
5)  desilting basin
沉沙池
1.
The data of sudden change of the main flow observed in a large-scale desilting basin located behind the main dike in the lower Yellow River indicated that the Markov probability prediction method can be used to predict the numbers of sudden change of the main flow with accuracy.
本文利用黄河下游淤背大型沉沙池主流突变次数实测资料的计算表明,采用马尔科夫概率预测法预报主流突变次数概率具有一定的准确度,游荡型河道的主流突变次数过程符合马尔科夫过程(MarkovProcess)。
2.
In this paper,according to the theory of over-satnrate transport concentration,the author puts forward calculation method of the whole process of silt movement on movable bed in desilting basin,including all calculations such as hydraulic factors,sedimentation rate,sedimentation feature and period etc.
根据一度流超饱和输沙法忽略挟沙力影响的基本计算式,给出沉沙池包括水力要素、泥沙沉降效率和淤积形态的动床计算方法,得出沉沙池泥沙运动的全过程,从而达到沉沙池合理布置和加快设计速度的目的。
3.
The paper also provides structural drawings of the desilting basin and the storage tank with volu.
文中提出了一个容积为147 m3的窑窖和沉沙池结构设计图。
6)  sand basin
沉沙池
1.
Study on effect of spillway trough on deposition efficiency of intermittent scouring sand basins;
溢流槽对定期冲洗式沉沙池沉淀效率的影响分析研究
2.
The appraisal and analysis on geology characteristics of sand basin of Dayudu Dianguan station;
大禹渡电灌站沉沙池工程地质评价分析
3.
Analysis and check on the calculation methods of silt deposition rate in the sand basin of hydropower station;
水电站沉沙池泥沙沉降率计算方法分析与检验
补充资料:沉沙池
沉沙池
sedimentation basin  

   沉淀水中大于规定粒径的有害泥沙,使水的含沙量符合水质要求并与下游渠道挟沙能力相适应的水池。其断面远大于引水渠道断面,水流至其内流速骤减,挟沙能力降低,泥沙遂沉于池中。进出口常设闸门。应在池中沉淀泥沙的最小粒径及沉于池中泥沙的沉降百分比,由用水性质确定。沉沙池按位置分为渠首沉沙池和渠系内沉沙池;按冲洗设备分为水力冲洗式沉沙池和机械清淤式沉沙池,前者又分为定期冲洗式(沉沙与冲洗交替进行)和连续冲洗式(供水和冲沙同时进行,多用于含沙量较大,颗粒较粗,且不允许中止供水的情况);按沉沙池的数目分为单室式和多室式;按平面布置分为直线形沉沙池和曲线形沉沙池。此外,黄河下游引黄灌区,常结合放淤改土使用条渠形沉沙池,淤满后即用于耕种。
   
   

山西芮城大禹渡引黄电灌站沉沙池

山西芮城大禹渡引黄电灌站沉沙池

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条