您的位置:首页 -> 词典 -> 后压灌浆
1)  post-compression grouting
后压灌浆
2)  post grouting for cast-in-situ pile
灌注桩后压浆
1.
Engineering application and theoretical research on post grouting for cast-in-situ piles;
灌注桩后压浆技术的工程实践及理论研究
3)  post grouting bored pile
后压浆灌注桩
1.
Taking the pile foundation design of post grouting bored pile with an engineering project in Taiyuan City, this paper introduces the design modification in the new code on post grouting bored pile and some problems needing attentions in the pile foundation design on liquefaction site.
以太原某工程后压浆灌注桩的桩基设计为例,详细介绍了新规范对于后压浆灌注桩的设计修正及在液化场地中桩基设计需要注意的问题。
4)  post-grouting
后灌浆
1.
Pre-grouting and post-grouting for construction of rock tunnel;
岩石隧洞工程的预灌浆与后灌浆
5)  post grouting piles
后灌浆桩
1.
Improvement mechanism and construction techniques of compound foundation of post grouting piles are described.
介绍了后灌浆桩复合地基的加固机理及施工工序 ,利用后灌浆桩加固南京某高层建筑物的地基 ,达到了工期短、安全可靠和造价低的效果 。
6)  posterior grouting bored pile
后压浆钻孔灌注桩
1.
Contrast study on comparison between high strain dynamic test and static loading test of posterior grouting bored pile;
后压浆钻孔灌注桩动静对比试验研究
补充资料:冲击波超压与动压

[解释]:  核爆炸产生的高温、高压火球膨胀,在周围介质中形成连续向外传播的压力脉冲(或冲击波),冲击波阵面传播到空间某点时,超过周围环境大器的压力称超压;空气粒子高速随波阵面运动产生的冲击压力称动压。超压和动压都以帕斯卡(Pa)为主单位。超压随时间的变化取决于爆炸威力、距爆点的距离和爆心周围的介质情况。特定地点的峰值超压一般出现在冲击波阵面到达该点的瞬间,超压在该点的持续时间称为正压作用时间。尔后,该点的压力下降到低于周围压力,称为负压,再逐渐回升到周围压力值。对人员的直接冲击伤,超压为20—29千帕可引器轻度伤;29—59千帕可导致中度伤;59—98千帕可造成重度伤;大于98千帕可造成极重度伤。动压为10—20千帕可造成中度伤;20—39千帕可造成重度伤;大于39千帕可造成极重度伤。动压的推动、抛掷和超压的挤压会造成物体变形和毁坏。