1) pre-stressed uplift pile
预应力抗拔(浮)桩
2) part-bonding pre-stressed uplift pile
部分粘接预应力抗拔(浮)桩
3) prestrain
预应变
1.
Effect of prestrain on impact toughness and ductile-brittle transition temperature of welded joint;
预应变下焊接接头冲击韧度及韧—脆转变的分析
2.
The Experimental Study on Mechanical Behaviour of Prestrain A3 Steel;
预应变A3钢的力学性能实验研究
3.
The effect of prestrain on the reverse martensitic transformation of TiNi shape memory alloy fibers embedded in an Al matrix has been studied by differential scanning calorimeter(DSC),X-ray diffraction(XRD) and scanning electron microscope(SEM) methods.
采用示差扫描热分析(DSC)、X射线衍射(XRD)和扫描电子显微分析(SEM)等方法,研究了预应变对铝基体中复合的TiNi形状记忆合金丝的马氏体逆相变的影响。
4) prestress ring
预应力环
5) pre-strain
预应变量
1.
The effect of pre-strain on shape recovery strain in an Fe-25%Mn-4.
5%Si-1%Cr-2%Ni合金预应变对可恢复应变量的影响,并用X射线衍射分析方法考察了应力诱发ε马氏体(εM)体积分数随预应变量的变化关系。
2.
The effect of the pre-strain and technique of heating and cooing on the recovery stress of Fe-Mn-Si-CrNi-C shape memory alloy has been studied.
研究了预应变量、加热和冷却工艺对FeMn-Si-Cr-Ni-C形状记忆合金回复应力的影响。
6) pre-strain
预应变
1.
Influence of pre-strain on fracture behavior of notched specimen of alloy steel with different graininess;
预应变对不同晶粒度合金钢缺口试样断裂行为的影响
2.
In these experiments,specimens were bending to produce different pre-strain respectively,and then reverse bending were taken one by one.
在各弯曲试样得到不同的预应变后,又对其进行反向加载,记录不同预应变下各试样反向加载的弯矩随表面应变的变化曲线。
3.
It is not unloaded until the given pre-strain value is reached.
在不同预变形下对几个试件分别进行加载,当达到给定的预应变值时就卸载,随后再进行反向加载试验,记录其屈服强度。
参考词条
补充资料:拔桩机
利用振动、静力或锤击作用将桩拔出地层的桩工机械。拔桩作业常采用相应的振动沉桩机、静力压桩机或双动汽锤,再配以桩架和索具,故也称振动沉拔桩机、静力压拔桩机。桩工施工中以振动拔桩较普遍,作业时,将振动拔桩机固装于桩头,通过弹簧吸振器和索具悬挂于吊钩下,开动拔桩机,振动器产生的振动,引起桩和土体共振,土体结构破坏,桩身与土体间摩擦力减小,同时收紧索具,将桩逐渐拔出。若采用偏心块式振动器,因沉桩和拔桩阻力方向不同,必须对偏心块进行调整。此种拔桩设备结构简单,拔桩效率高,有发展前途。液压拔桩机利用其夹桩器夹住桩头,液压缸强制顶压夹桩器,使之向上顶升一段距离,将桩逐段拔出,适用在粘土、砂土或含少量砾石的土层中拔工字钢或型钢桩。也有采用机械方法拔桩的,即由电动机驱动卷扬机,利用钢丝绳滑轮组的拉力将桩强制拉出地面。使用方便,成本低,但拔桩力不大、设备笨重、拔桩效率低,只适用于软土地层施工。利用双动汽锤拔桩,系将锤体倒置,固定于桩头,并悬挂于索具下,先将土中桩头晃动,减低桩和土壤间紧密度,然后开动汽锤,向上锤击振动,收紧索具,将桩逐渐拔出,可在各种土层中拔混凝土桩及其他桩。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。