1)  uplift pile
抗拔(浮)桩
2)  pre-stressed uplift pile
预应力抗拔(浮)桩
3)  permanent uplift pile
永久性抗拔(浮)桩
4)  part-bonding pre-stressed uplift pile
部分粘接预应力抗拔(浮)桩
5)  resistant extraction
抗拔
1.
Study on prestressed high concrete pile as resistant extraction pile in Shanghai;
上海地区PHC管桩作抗拔桩的探讨
2.
Based on comparative test on resistant extraction and pressure of five super-long and large-diameter bored piles with same diameter and similar length in the same ground,the community and difference of distortion behavior and load transmission property are analyzed.
通过五根直径相同、桩长相近、位于同一场地的超长大直径钻孔灌注桩在拔力与压力作用下的对比试验,分析抗拔桩与抗压桩在变形性状和荷载传递机理的相同性和差异性。
6)  uplift
抗拔
1.
Study on uplift mechanism and calculation of DX pile;
DX桩抗拔承载机理及设计计算方法研究
2.
Based on the theory of limiting equilibrium,the Mohr-Coulomb yielding criterion and slip-line field method,the fundamental equations of stress distribution on the failure plane have been established about the undisturbed soil foundation in transmission line engineering while the uplift limiting condition.
根据经典土力学极限平衡状态下土微元体静力平衡方程式、Mohr-Cou lomb屈服准则和滑移线场理论,建立了输电线路原状土杆塔基础上拔极限平衡状态时滑动面上的应力分布基本方程式,并根据有关文献成果引入土体破裂面方程和边界条件假设,得到了输电线路原状土基础土体滑裂面抗拔极限承载力理论计算公式。
3.
The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.
本文结合工程实践,通过现场试验分析研究提出锚杆桩抗拔极限荷载直接或间接的确定方法,并提出了合理的施工方案。
参考词条
补充资料:拔桩机
      利用振动、静力或锤击作用将桩拔出地层的桩工机械。拔桩作业常采用相应的振动沉桩机、静力压桩机或双动汽锤,再配以桩架和索具,故也称振动沉拔桩机、静力压拔桩机。桩工施工中以振动拔桩较普遍,作业时,将振动拔桩机固装于桩头,通过弹簧吸振器和索具悬挂于吊钩下,开动拔桩机,振动器产生的振动,引起桩和土体共振,土体结构破坏,桩身与土体间摩擦力减小,同时收紧索具,将桩逐渐拔出。若采用偏心块式振动器,因沉桩和拔桩阻力方向不同,必须对偏心块进行调整。此种拔桩设备结构简单,拔桩效率高,有发展前途。液压拔桩机利用其夹桩器夹住桩头,液压缸强制顶压夹桩器,使之向上顶升一段距离,将桩逐段拔出,适用在粘土、砂土或含少量砾石的土层中拔工字钢或型钢桩。也有采用机械方法拔桩的,即由电动机驱动卷扬机,利用钢丝绳滑轮组的拉力将桩强制拉出地面。使用方便,成本低,但拔桩力不大、设备笨重、拔桩效率低,只适用于软土地层施工。利用双动汽锤拔桩,系将锤体倒置,固定于桩头,并悬挂于索具下,先将土中桩头晃动,减低桩和土壤间紧密度,然后开动汽锤,向上锤击振动,收紧索具,将桩逐渐拔出,可在各种土层中拔混凝土桩及其他桩。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。