说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 分仓浇筑
1)  sequence placing
分仓浇筑
1.
Based on project practice,sequence placing and comprehensive controlling methods are applied.
结合工程实践探索采取分仓浇筑、综合控制等措施进行超长大体积混凝土施工的方法,可取消后浇带,简化施工,有效控制混凝土裂缝的出现,保证结构施工质
2)  pour dividing rooms
浇筑分仓
3)  pour by pour
分块跳仓浇筑
1.
Super-long and super-wide underground box foundation concrete structure pouring with general concrete (no deformation seam, no repour strip, no special material) can reach the result in cracking control by the "pour by pour" method, optimization design, material control, temperature control, concrete curing without increase salary or extension.
超长超宽大型地下混凝土箱基施工,不设变形缝、不留后浇带、不掺特殊材料的普通混凝土采用分块跳仓浇筑施工工艺,结合设计优化、原材料控制、加强温控和养生等综合技术措施,可在不增加投资、不延长工期的条件下达到有效控制混凝土裂缝的目的。
4)  working-face
浇筑仓面
5)  sequence placement
跳仓浇筑
1.
In this paper,a method of combining simulation computation program studied by independence with finite element calculation software is used to settle the difficulty in simulating three dimensional concrete sequence placement in complex mass hydraulic structure such as hydropower plant.
采用大型有限元计算软件与自主开发温度场仿真程序相结合,对某水电站厂房依照实际浇筑过程进行了温度场仿真分析,解决了仿真计算中混凝土跳仓浇筑的困难,通过与以前方案比较,说明浇筑方案对厂房温度场分布有较大影响,设计时可选择施工方案来降低温度。
2.
Therefore, a new function of three dimensional concrete sequence placement calculating method is added to FZFX3D - a software to simulate the dam construction process.
与传统意义上的施工仿真计算相对应 ,提出了大坝混凝土施工实时仿真计算的概念 ,完成了相应于混凝土施工三维跳仓浇筑仿真计算程序的开发 ,并将其应用于三峡大坝左厂9#坝段的仿真计算 。
6)  pouring without longitudinal joint
通仓浇筑
补充资料:仓仓
1.象声词。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条