说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 填芯预应力混凝土管桩
1)  prestressed concrete pipe pile with the concrete core
填芯预应力混凝土管桩
2)  pre-stressed concrete tubular pile
预应力混凝土管桩
1.
Application of pre-stressed concrete tubular pile at shiplock of Changzhou Hydraulic Complex;
预应力混凝土管桩在长洲船闸工程中的应用
2.
Application of pre-stressed concrete tubular pile in northwest China;
预应力混凝土管桩在西北地区的应用
3.
Construction quality control of static pressure pre-stressed concrete tubular pile;
静压法预应力混凝土管桩的施工质量控制
3)  high strength prestress concrete pipe pile
高强预应力混凝土管桩
1.
This paper presents the design scheme,structure and construction measures of high strength prestress concrete pipe piled embankment.
文章介绍了高强预应力混凝土管桩路堤的设计方案、结构及施工技术措施。
4)  prestressed concrete tube pile
预应力混凝土薄壁管桩
1.
Modified pretensioned prestressed concrete tube pile has advantages like powerful strength,strong ability to penetrate,short construction period and convenient test method.
改进的先张法预应力混凝土薄壁管桩具有强度高、穿透能力强、施工工期短、检测方便等优点,用于加固深厚软弱垃圾土路基,提高路基的强度和稳定性,具有一定的实用价值。
5)  prestressed concrete pipe pile
预应力混凝土管桩
1.
Design of prestressed concrete pipe pile used as anti-lift test pile in static load testing;
预应力混凝土管桩抗拔静荷载试验中试桩的设计
2.
Experimental study on shear capacity of connections between prestressed concrete pipe pile and pile cap;
预应力混凝土管桩与承台结合部抗剪承载力的试验研究
3.
About the hydraulic method construction of the prestressed concrete pipe pile;
浅谈高强预应力混凝土管桩液压法的施工
6)  prestressed concrete pile
预应力混凝土管桩
1.
Reliable test data of the prestressed concrete pile must be used as design basis during practical applications to ensure construction safety.
预应力混凝土管桩是一种具有良好工艺性能、适应性强、承载力高、施工工期短等优点的新型桩型,在实际使用上完全可以替代普通混凝土预制桩和灌注桩。
2.
In t his article, through the introduce of usage of the prestressed concrete pile mec hanical bond express joint ,which is in the form of geared join , in one college of the Daxue City, it emphatic expounds the construction method, advantage and the problem in constructing of this joint.
预应力混凝土管桩机械快速接头作为一种新型的管桩连接技术,近年在工程中时有使用。
3.
In the basement construction of the Guangdong Olympic Gym Center,the prestressed concrete pile is adopted as resistant extraction pile to resist buoyancy the first time.
首次将预应力混凝土管桩作为抗拔桩应用在广东奥林匹克体育场地下室抗浮设计中。
补充资料:预应力混凝土
      见预应力混凝土结构。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条