1) Embedment and installation
埋设安装
2) directly buried cold installation without expansion joint
无补偿冷安装直埋敷设
1.
The design methods,pipeline arrangement forms,construction difficulties and operation maintenance between directly buried cold installation without expansion joint and directly buried installation with expansion joint are compared.
对热水供热管道的无补偿冷安装直埋敷设与有补偿直埋敷设的设计方法、管道布置形式、施工难度及运行维护进行了比较。
3) Direct buried
直埋安装
4) flush mounting
埋入安装
5) installation of embedded parts
预埋件安装
1.
So,in the construction of breast wall concrete,a series of technique measures are taken in quality contral points as moldboard design,installation of embedded parts,crack prevention of mass concrete and detail treatment,and achieve go.
为此 ,在戊码头的胸墙施工中 ,针对模板设计、预埋件安装、大体积砼防裂以及细部处理等质量控制点采取了一系列的综合性技术措施 ,并取得了良好的效果。
6) setting up
安装,安设
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条