1) well completion
终孔
1.
The well completion is a new landmark in the development of China′s drilling technology.
中国大陆科学钻探工程经过1309天的努力奋斗,于2005年1月23日,钻井终孔深度达到5118。
2) termination measure
终孔措施
1.
This paper analyzes the termination measures for anchor-rod rock-socketed piles of high-piled wharf combining with an engineering practice,to ensure that the bearing capacity of pile foundation satisfies the design requirement.
通过工程实践,分析高桩码头锚杆嵌岩桩终孔措施,以确保桩基承载力满足设计要求。
3) hole termination depth
终孔深度
1.
Combining an engineering practice, it studied and discussed the hole termination depth of drill hole concrete pile and provided rational measures for guaranteeing that the bearing capacity of foundation would satisfy the design requirement.
通过工程实例,对钻孔灌注桩终孔深度进行探讨,并提出合理的措施,以保证地基承载力满足设计要求。
4) Stoppage indentification
终孔判定
1.
Stoppage indentification of slurry drilled pile embeded in highly weathered rock;
强风化嵌岩钻孔灌注桩终孔判定的探讨
5) borehole bottom location
终孔位置
6) standard of end hole
终孔标准
补充资料:第二孔(继发孔)型缺损
第二孔(继发孔)型缺损
ostium secondary defect
是心房间隔在形成上发生障碍,一般缺损较大,多在卵圆孔附近称第二孔(继发孔)型缺损。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条