1)  management
贷款项目管理
2)  loan
贷款
1.
Construction of the Defense Measures Against University Loans Risks;
构筑高校贷款风险的防御措施
2.
Promoting establishment of water-saving society by using loans of China Development Bank;
利用国家开发银行贷款 推进节水型社会建设
3)  loans
贷款
1.
The present situation,problem and countermeasures of afforestation in Hunan Province by the loans from the World Bank;
湖南世行贷款造林现状、问题及对策
2.
Running the college and university by using the loans of the banks can help the college and university realize the leapfrog,but also brings about certain risks to the college and university.
高校利用银行贷款办学,实现跨越式发展的同时,也给学校带来了一定的风险。
3.
Such changes were reflected in the large increase of loans provided by financial institutions, the accelerated growth of M2, the continuous expansion of deposits, the continued active trading in the interbank market, the V-shaped movement of money market rates, and the continued stability of the RMB exchange rate.
主要表现为,金融机构贷款增加较多;货币供应量M2增长速度明显加快;各项存款持续增加;银行间市场交易活跃,货币市场利率呈"V字型"运行;人民币汇率继续保持稳定。
4)  credit
贷款
1.
This thesis used the 317 household survey data of Zhejiang province of China to set up a Logit model to study factors affecting the availability of credit for farmers.
利用317份浙江农户调查数据,采用二元Logit模型研究了影响农户是否获得贷款(贷款意愿)的因素。
2.
Chinese commercial banks show remarkable reluctance to extend credit to small businesses, the immediate cause of which is small businesses are usually bringing in less profit, suffering from bad credit record, and inadequate in providing essential information, which endanger the banks expected profit.
我国商业银行在中小企业贷款问题上存在明显的“惜贷”倾向。
5)  the loans of environmental conservation
环保贷款
6)  Right of loan
贷款权
参考词条
补充资料:项目贷款风险管理


项目贷款风险管理


提供产品和服务,后者当然不支付或少支付货款,从而使偿还贷款的资金来源中断或不足,贷款人蒙受损失。为防止贷款人因工程停工或开工不足而蒙受上述风险,一般要签订最低支付额合同、差额支付协议和直接担保合同。 另外对经营风险、市场风险、政治风险等,贷款人也要求发起人或项目所在国政府作出承诺或担保,以使贷款按期收回。I项目贷救风险管理]一个工程项目尽管有了严密的可行性研究与规划,贷款人仍然担心由于不可控制的原因,贷款不能按期收回。为此,贷款人常常要求项目参予人或与项目有共同利害的关系人做出担保。如果在工程建设进行阶段发生费用超支或中途停建,在营运阶段出现开工不足或不开工等问题时,担保人要负偿还全部贷款的责任。 影响贷款偿还的主要风险与风险防范的主要措施有: (l)费用超支风险。由于通货膨胀等原因造成超支时,解决的办法有:由发起人提供超支资金;由贷款人提供一定数额的超支资金;由国家银行提供一定金额的备用信贷;由项目产品的购买者或设施用户提供;由希望工程完工的政府提供。 (2)不能按期完工风险。在项目建设过程中,如因设计错误、施工能力差、成本超支、贷款用完尚未建成或自然灾害等原因致使项目不能按期建成。为防范这一风险,贷款人需要得到工程项目具体完工日期的保证,以免贷款到期不能收回。按规划要求,选择质量高、经营作风良好的设计师与承包商,是工程按期完工的重要保证。 (3)中途停建风险。虽具备了完成工程建设的足够资金,但由于技术、政治或其他经济原因致使工程建造中途停顿,从而偿还贷款的资金来源中断。为防止这类偶然事件的发生,贷款人常要求工程项目主建单位或项目产品购买人或设施用户,或其他信誉良好的机构给予担保,即使工程中途停建,担保人承担对贷款的归还责任。 (4)工程停工或开工不足风险。工程完工以后,在营运阶段,由于不可预计的原因,如出现停工或开工不足,则会导致项目停产或产品不足,无法按合同向产品购买人或设施用户
说明:补充资料仅用于学习参考,请勿用于其它任何用途。