1)  cross-section
净空断面
2)  clearance
净空
1.
For greater benefit, the railway freight requires operation of double-decked container trains, making the clearance under the railway overpass insufficient.
为了提升效益,铁路货运需要开行双层集装箱列车,而上跨铁路立交桥桥下净空不足。
2.
From purposes and clearance specifications of reserve runway, this paper points out the deficiencies in the airfield clearance regulations of reserve runway, and presents the composition of and the requirement for the reserve runway clearance area.
从备用跑道用途及其净空规定出发,指出现行备用跑道净空规定存在的问题,提出备用跑道净空区的组成和要求,并应用飞机起落航线理论,对应急起飞着陆及应急起飞备用跑道净空规格的来源进行了研究。
3)  clearance convergence
净空收敛
1.
By site monitoring,such as ground settlement,clearance convergence,vault crown settlement and site observation, etc.
以景(德镇)婺(源)黄(山)高速公路姚村坦连拱隧道施工中出现的险情为例,结合地表沉降、洞内净空收敛及拱顶下沉进行观测及现场观察,针对隧道出口段围岩失稳导致中导洞右侧工字钢严重内敛现象进行了动态预报,从而为及时采取有效措施排除险情争取了时间,避免了重大事故的发生,以此进一步说明了监控量测在隧道修建过程中的必要性。
4)  headroom
低净空
1.
According to the spatial structure analysis of buildings and OCS,the calculation method and criterion of headroom used for OCS pass of existing railway line are given.
通过对既有线低净空建筑下接触网通过的空间结构尺寸分析,给出了低净空的计算方法和判据,结合沪杭线电气化工程实际,归纳出5种既有线接触网低净空通过方案。
5)  airport clearance
机场净空
1.
Airport clearance limit and obstacle location serves as a special one to understand and promote the relation between clearance limits and obstacles.
以庆阳机场为例,将数字地形分析和三维可视化技术应用到机场净空障碍物分析领域中。
6)  regulations in clearance
净空规定
1.
In the process of using the military airfield regulations in clearance,since the user may confuse the current rule with the old one,the paper analyzes and compares the differences between the current rule and the old one in clearance,with special emphasis placed on the revised parts of the basis principles,the composition of the clearance zones and the obstacle limits.
针对使用单位在应用《军用机场净空规定》的过程中,容易将新规定与原规定内容混淆的问题,分析比较了机场净空新旧规定的差异,对新规定中净空要求的基本原则、净空区组成和障碍物限制要求等方面的修改进行了详细分析。