1) crack depth
裂缝深度
1.
Determination of crack depth in reinforced-concrete structure by the ultrasonic testing method;
超声平测法检测钢筋混凝土结构裂缝深度
2.
Considering the influence of the environment and the direction of electrical current on the conductive capacity of crack,the change of apparent resistivity with crack depth was obtained by numerical simulation method.
在考虑到干燥环境、潮湿环境和输入电流方向对裂缝导电能力影响的前提下,采用数值模拟技术探讨了表观电阻率随裂缝深度的变化规律,并将实际裂缝简化为等效裂缝,进而提出裂缝等效电路和等效电阻的方法,研究了表观电阻率与裂缝密实度的关系。
2) Depth of crack
裂缝深度
1.
The ultrasonic method is unfit for inspecting the depth of crack originated from live load, since the crack will close after the load is removed.
通过对某高桩码头横梁裂缝深度的超声检测、骑缝取芯验证,说明对于活荷载引起的结构性裂缝,由于卸载后裂缝重新闭合,超声法检测存在局限性。
3) fracture penetration
裂缝穿透深度
4) Deep fracture
深裂缝
1.
The application of RaA testing technique on researching deep fracture belts in a rockslope;
氡(RaA)测试技术在某岩质边坡卸荷深裂缝带研究中的应用
2.
But there is a series of sheeted fracture or zone of fracture that was named as deep fracture is relate to a project.
对涉及的工程岸坡在正常卸荷带以内发育了一系列张性破裂或破裂带,称之为"深拉裂缝",其分布规律的研究对其成因有着主要的作用,并在地层岩性、地质构造、河谷地貌、现今地应力场调查研究和深裂缝统计分析、声波测试、氡气测试、方解石测年、地应力测试等多种测试手段研究的基础上,对深裂缝的分布规律做了较为充分的论证。
5) deep fracture
深部裂缝
1.
The deep fractures are well developed at the left abutment slope.
从工程地质类比的角度对锦屏一级水电站坝区4个边坡工程地质条件进行了详细比较,指出了区域的地壳活动水平和构造应力场强度是普斯罗沟左岸边坡深部裂缝形成的本质原因和前提条件,但是仅仅具备这个条件并不一定在边坡内部出现深部拉裂,普斯罗沟左岸边坡的边坡坡体结构以及岩性组合是深部裂缝形成的物质基础。
2.
The deep fracture regularity of Pusiluogou left abutment slope at Jinping first stage hydropower station is comprehensively studied; and four deformation models of deep fracture are put forward; they are gentle shear and steep tension, gentle shear-tension belt, steep shear and gentle tension as well as tension respectively.
通过对锦屏一级水电站普斯罗沟坝址左岸深部裂缝的发育特点及规律的研究,提出了深部裂缝4种变形模式,即缓剪陡张型、缓倾张剪带型、顺剪反张型和引张型。
6) deep fractures
深部裂缝
1.
Study on the mechanism of the deep fractures of the left abutment slope at the Jinping first stage hydropower station;
锦屏一级水电站普斯罗沟左岸深部裂缝成因的工程地质分析
2.
At first,the slope geological conditions as well as dam site geostress and deep fractures in the left bank of Jinping first stage hydropower station have been investigated.
对锦屏一级水电站边坡工程地质条件、坝址区实测地应力分布及左岸深部裂缝发育规律进行全面分析,采用UDEC和3DEC离散元程序模拟锦屏一级水电站河谷的演化发展,对河谷边坡不同演化阶段应力场的变化规律及变形与卸荷分带规律进行深入分析。
补充资料:大型设备基础混凝土裂缝防治
大型设备基础混凝土裂缝防治
protection and treatment for crack during construction of large volume foundation
daxlng shebe一Jiehu hunningtu}iefeng fangZhl大型设备蓦础混凝土裂缝防治(proteetion。ndtreatment for eraek during eonstruetion of large vol-ume foundation)在冶金工厂建设中,设备基础的混凝土约占混凝土工程总量的60%以上。随着冶金设备向大型化发展,设备基础的体积愈趋庞大。以中国上海宝钢工程为例,容积为4063m“的1号高炉,其基础混凝土工程量约为600om3;3座3oot转炉的基础底板的混凝土工程量将近700om“。施工时每次混凝土的浇筑量多在looom3以上。施工中,水泥水化热引起混凝土浇筑块体内部温度和温度应力剧烈变化,以及混凝土的凝结收缩,都会引起对结构整体性、耐久性和强度有影响的混凝土裂缝。防止这种裂缝的产生和对已出现裂缝的有效治理是保证工程质量的关键之一。 裂缝原因和防止原则在大型设备基础的施工中,当混凝土内部温度变化和凝结收缩引起的变形受到约束时,浇筑块体内就要产生应力。当其中的拉应力超过混凝土材料的抗拉极限时就会出现裂缝。对变形的约束有两类情况:一是混凝土浇筑块体内部各质点间因变形量不同而产生相互牵制和影响,称为“自约束”;二是浇筑块体的变形受到外部物体(如地基、相邻结构、下部混凝土浇筑层等)的阻碍,称为“外约束”。 为防止裂缝的产生,应从以下几个方面考虑对策。(1)提高混凝土自身和混凝土结构的抗裂能力。施工中要严格控制材料和施工工艺,使结构质量完全符合设计和规范要求。(2)减少混凝土中的总发热量,降低水泥水化发热速率,合理调剂混凝土在凝结过程中的温度与湿度,以减小温度应力和收缩产生的应力。(3)减弱内、外约束的影响。(4)重视控制温度对防止裂缝产生的决定性作用,在基础施工的全过程中,按阶段进行温度应力分析,确定温度控制指标和技术措施。 沮控防裂措施包括基础设计、混凝土配制、混凝土浇筑与养护、施工中混凝土温度监测四个方面。 基础设计主要措施有:(1)基础混凝土的强度等级应为C巧一C25。(2)对独立的大型钢筋混凝土设备基础不设沉降缝、温度缝等永久变形缝。(3)当基础设置于岩石地基上时,在混凝土垫层上表面应设滑动层(可采用一毡二油构造),以减少地基对混凝土变形的约束。(4)基础配筋除应满足基础承载力及构造要求外,还要增配承受因水泥水化热引起的温度应力及控制裂缝开展的构造钢筋。 混凝土配制主要措施有:(1)选定混凝土配合比时,应在保证基础强度、耐久性和施工工艺要求的前提下尽量减少水泥用量,以降低混凝土的绝对温升值。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条