1) body shake
人体震动
1.
The primary study on the effect of body shake on exercise and health in exercise;
运动中人体震动对运动及健康的影响研究
3) fluid vibration
流体震动
4) artificial ground shaking
人工地震动
1.
n this paper,the application of the technique in our country for increasing the output of petroleum by means of artificial ground shaking is described.
本文对人工地震动增油技术在全国各油田应用所取得的经济效益进行了对比,对本项技术的应用提出了建议。
5) Artificial ground motion
人造地震动
1.
Integrating with the simulation method of stochastic process,the authors present the review of the main synthesis methods and current research on artificial ground motion both domestic and abroad.
结合随机过程的模拟方法,对国内外人造地震动的主要合成方法及研究现状进行述评。
2.
In this paper, a method, which synthesizes the artificial ground motion compatible with the specified peak velocity as well as the target acceleration response spectrum, was proposed.
提出一种以绝对加速度反应谱和峰值速度为目标的合成人造地震动时程的方法。
6) artificial earthquake wave
人造地震动
1.
In this paper, the application of modulated ARMA model in simulation of artificial earthquake waves is discussed on the several aspects such as determination of the ARMA model orders, determination of the ARMA model parameters and influence of the initial random series.
探讨了调制ARMA模型在人造地震动仿真应用中的模型定阶、模型定参及初始随机序列的影响问题。
补充资料:240震动机操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条