说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 改扩建项目
1)  extension project
改扩建项目
1.
Research on investment decision for extension projects based on value project;
基于价值工程的改扩建项目投资决策分析
2)  expansion project
扩建项目
3)  rebuilt-project
改建项目
1.
Based on the objectivity of the industry development and city progress in China, it is pointed out that the rebuilt-project of used industry plant site in city has been an important item in construction field, and its features include complicated cause of formation, strong restrictions and multiform matter.
从我国工业发展及城市化进程的客观实际出发,指出城市内旧工业厂区的改建项目已成为建设领域内的一项重要内容,具有成因复杂、实施约束强、内容及形式多样等特点。
4)  large reformed or expanded petrochemical project
大型改扩建石化项目
5)  thermal power station extension project
火电站扩建项目
6)  Coal mine Construction project
煤矿扩建项目
补充资料:改扩建项目评价


改扩建项目评价
evaluation of project for rehabilitation expansion

  gaikuojian xiangmu Pingiio改扩建项目评价(evaluation of projeet forrehabilitation/expansion)改扩建项目是在现有企业的基础上进行的,不可避免地要与现有企业发生种种联系,从而决定了改扩建项目有其不同的经济计算与评价方法。 改扩建项目的经济评价一般要用总量指标、增量指标沉入成本和原有固定资产来判别项目的可行性。 总量指标计算总量指标即在现时运转水平下的投人和产出用作起始点,再把另外的投入和产出与它们相加就得到在完成改扩建后(或有项目)每项投入和产出的总数量。 用总量指标评价改扩建项目就是用改扩建后(或有项目)的净现值是否大于或者至少等于改扩建前(或无项目)的净现值来评价改扩建项目。还可用下列方式加以表达 改扩建后(或有项目)的NPv~, 子拱一懊乡共州粤黑月乡甚兴县于J>1 改扩建前(或无项目)的NPvZ‘式中NPV为净现值。 增量指标增量指标计算有两种方法:一是前后对比法,一是有无对比法。计算项目改扩建以后和改扩建以前净效益差值的方法称为前后法;计算有项目与无项目净效益差值的方法称为有无法。有项目与无项目的对比不同于项目前与项目后的对比。项目前是一种状态,只反映未建项目的状况,不反映不建项目的整个计算期由可能的变化状况;无项目则是指不建该项目时的方案,它考虑在没有该项目的情况下整个计算期项目可能发生的情况。所以前后法不能说明在无改扩建情况下投人产出方面随着时间变化所发生的变化,因而会导致对改扩建作出错误的判断。 在无改扩建项目时,企业的净效益也可能会逐年发生变化,常见的有四种情况:(1)有项目和无项目的净效益都增长,其增量效益为有、无项目的净效益之差(图中a)。(2)有项目可以防止无项目时效益递减,维持项目前的净效益水平(图中b)。采掘工业常属此类。(3)有项目不仅可以避免无项目时净效益的逐年下降, 而且还比项目前的净效益有所增加(图中。)。旧企业 设备老化,净效益逐年递减,属于此类。(4)无项目的 净效益保持不变,则前后法与有无法相同(图中d)。。卜瓤_卜目前/有项目,‘黔黔.鬓巴卿- 年份毋b年份 1吞丫了Z/////l翎l乡厂Z/////l相1矛丫了2/也屠浩翻解/月攀l洲刃///////J拱碑毛以丈产八曰于了了子了尹洲赞l洲刁l,/,j,l,,11‘巨主孟趁兰腻漏渐趟 年份d年份 增量效益图 沉入成本在改扩建项目费用计算中常常会遇到 沉入成本问题。沉入成本亦称旁置成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条