1) vested wired platform bridge steel box beam
既有线天桥钢箱梁
2) existing steel truss bridge
既有钢桁梁桥
1.
Based on the theory of structural dynamics,the damage identification and diagnosis of existing steel truss bridges is studied.
从结构动力学基本理论出发,对既有钢桁梁桥的损伤识别与诊断方法进行了研究。
3) existing bridge
既有桥梁
1.
Time-dependent reliability analysis of existing bridges strengthened with FRP laminates;
既有桥梁外贴纤维布加固后可靠度分析
2.
To reduce the influence of deep water foundation construction to existing bridge foundation,to reduce the plugging of flood channel and to lower the construction cost,the project was adopting a serious technique measures of double thin-walled steel and steel concrete combined cofferdam,using different cofferdam style in different locations and .
为减小深水基础开挖施工对既有桥梁基础扰动、减少桥梁基础施工对防洪河道堵塞与降低施工成本,工程中采用了双薄壁钢—钢筋混凝土组合围堰与不同地点采用不同围堰形式等一系列技术措施。
3.
The paper analyzed the main failure of existing bridges,discussed advantage and disadvantage of strengthening methods for traditional bridge.
对目前既有桥梁存在的主要缺陷进行了较全面的分析,通过对传统桥梁加固方法的优缺点的论述,提出碳纤维材料加固桥梁的优越性。
4) Existing bridges
既有桥梁
1.
Post earthquake investigation system for existing bridges
既有桥梁震后应急评估系统
2.
FNM method for estimating reliability of existing bridges
评价既有桥梁可靠性的FNM法(英文)
3.
Therefore, the reasonable evaluation on the bearing capacity of existing bridges is not only an urgent issue in order to insuring the sa.
合理评估既有桥梁承载能力是保证线路安全的一项重要工作,也是需要进一步研究的重要课题。
5) existing steel bridges
既有钢桥
1.
3D finite-element model simulation and remaining fatigue life assessment of existing steel bridges;
既有钢桥工作状态模拟与剩余寿命评估
2.
In China, the situation of many existing steel bridges, especially the remaining fatigue life is a topic of considerable importance.
我国既有钢桥的使用状况不容乐观,其疲劳剩余寿命已受到桥梁管理部门的高度重视。
6) existing reinforced concrete bridge
既有钢筋混凝土桥梁
1.
An attenuation model for time-dependent structural resis-tance of existing reinforced concrete bridges is introduced, and a method for determining or modifying the model parameters with available resis-tance information using regression and least squares principles is detailed.
针对既有钢筋混凝土桥梁的特点 ,讨论了结构抗力的衰减模型 ,并提出了根据已有抗力信息采用回归分析方法及最小二乘法确定或修正模型参数的方法 ;建立了以现时刻为分析时间起点的考虑抗力随时间变化的继续使用期内承载能力可靠度分析模型 ,并讨论其求解方法。
补充资料:天桥急流
滔滔黄河,在流经我国内蒙古自治区托克托县河口镇后,因为受地质构造线的控制,突然急转南下,进入“晋陕峡谷”之中。在此幽深的峡谷中,黄河咆哮着奔腾725公里,直到禹门以后,才缓缓流入平原地区。
“晋陕峡谷”,在山西与陕西两省交界处,中以黄河为线。此处黄河水时慢时急,婉蜒曲折,大有“黄河九十九道弯”之势,其河面时宽时窄,形成许多险滩和急流,“天桥急流”便是其中一大自然景观。
“天桥急流”,在河曲县石梯村和水寨岛之间,全长20公里。此地峡深谷幽,水势迅猛,波涛汹涌,与连绵不绝的峰峦自然组合,天与地、水与雾,鬼斧神工浑然一体,构成一幅壮美的奇景。
“雾迷浪”险滩,横拦在峡谷之中部,几座犬牙交错的巨石屹立在河心。但见汹涌的黄河急流似从天而降,时而原地旋转,时而频频推进,时而自石涧中冲出,时而钻入岩石背后,绽出万朵美丽的浪花,气势颇为壮观。尤其在水流湍急之时,水雾腾空,遮天蔽日,其景令人生畏。
每逢冬季,这里积冰成桥,堪称巧夺天工之作。其形状不一,有拱形的,有斜面的,还有不知名状的,令人眼花瞭乱。但见桥之下水势迅猛,涛声滚滚震耳。人们将这种冰桥称做“天桥”意为天神所造。冰桥附近的村庄因此改名为天桥村。现在冰桥下游,国家已建成山西省境内最大的水电站——“黄河天桥水电站”,使晋陕峡谷更增光辉。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条