2) predictable watershed
预测分水岭
1.
In the temporal state a preliminary segmentation is done through detecting the difference between two successive frames to locate the moving object in rough,while in the spatial state the predictable watershed algorithm is used to accelerate the conventional one and make the temporal segmentation result more exa.
在空间域阶段,采用预测分水岭算法对运动目标进行精确定位。
3) predications/high water content
预测/高水分
4) forecast of current and sediment
水沙分析预测
5) flood classified prediction
洪水分类预测
6) terminal water quality prediction
终端水质预测分析
补充资料:发育进度预测法(见发生期预测)
发育进度预测法(见发生期预测)
发育进度预测法见发生期预测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条