1) expired cost
过期成本
1.
Embarks from the monocycle stock model main consideration cost element, through the expectation loses smallest method and expectation profit biggest method realizes to the monocycle stock model in the stockout cost and the expired cost control,then determination best volume of order.
从单周期库存模型主要考虑的成本因素出发,通过期望损失最小法和期望利润最大法实现对单周期库存模型中缺货成本和过期成本的控制,从而确定最佳订货量。
2) overstock cost
过剩成本
1.
By decentralizing the inventory control,the total inventory cost(including overstock cost) can be optimized.
本文针对超市的生鲜食品补货的特征,增加对于过剩成本的考虑,采用分散库存控制权的方法,按照从门店到配送中心的思路,优化总库存成本,从而得出最佳的订购批量,同时也得出最佳的产品供给水平、再订货点等。
3) transitional cost
过渡成本
5) construction period cost
工期成本
1.
This paper discusses on the project-based financial cost control of the construction enterprise from aspects of the quality cost control, safety cost control, construction period cost control, and late stage cost control, etc.
从质量成本控制、安全成本控制、工期成本控制、工程的后期费用控制等方面论述了施工企业项目财务成本的控制。
6) high cost period
高成本期
1.
with the social progress and economic development,Chinese enterprises are entering into high cost period.
随着社套进步、经济发展,中国企业生产进入高成本期。
补充资料:过期
超过期限:~作废。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条