1)  Optimization of construction method
施工方法优化
2)  construction
施工
1.
The application of overall safety management in the construction of bridge;
全面安全管理在桥梁施工中的应用
2.
Drawing Up a Completed Project Technical File in Construction Stage of Chemical Industry Construction Item;
化工建设项目施工阶段交工技术文件编制
3.
Questions existed in construction of building fire protection facilities and countermeasures;
浅谈建筑消防设施施工存在的问题及举措
3)  application
施工
1.
The application of construction machine in the rural roads;
浅谈农村公路施工机械的使用
2.
Study and application of a glaze-surface putty of quick dry at room temperature;
常温快干釉面腻子的研制与施工
3.
The critical consideration is attached to rust removing,application of anti-corrosion and fireproof coatings and its quality control.
根据钢结构防护效果与基体表面预处理品质、防腐防火涂料的涂装品质及施工环境的关系,提出了一套钢结构涂层防护施工品质的控制方法,具有较好的可操作性和实用性。
4)  construct
施工
1.
Brief Analysis on the Smooth-traffic Project during the Reconstruction of Old Roads;
浅析老路改造施工期间的保畅工程
2.
Importance of management for OPGW constructing process;
从一次OPGW的施工故障看施工过程管理的重要意义
3.
The Organization and Management of the Construction in Preparatory Stage;
施工准备阶段的组织管理
5)  operation
施工
1.
Fracturing sand control plan and matters often neglected in operation process and solution method;
压裂防砂技术设计和施工过程中常忽略的几个问题及解决方法
2.
Bus Interior Trim Design and Operation;
现代客车内装饰设计与施工
3.
Several problems of designing and operation for pretension concrete piles;
预应力管桩设计与施工的几个问题
6)  installation
施工
1.
In this paper,the structure of steam superheater (A BA701) lining,its installation method and points for attention during installation are introduced in detail.
本文详细地介绍了某厂蒸汽过热器 ( A— BA70 1 )衬里的结构、施工方法及施工中的注意事项 ,对结构相同或相似衬里的施工有着指导意义 。
2.
The author of this paper presents some proposals about the production and appropriate lay-out in installation of large size ACSR.
大截面钢芯铝绞线在生产上并不复杂,但从各大电网公司输变电施工等部门反馈的信息来看,产品仍有诸多的缺陷。
3.
Base on actual engineering on prestressed concrete pipe piles applied in deep foundation pit,issues of designing and installation are discussed.
本文介绍预应力管桩在深基坑支护工程应用的工程实例,探讨基坑支护采用管桩在设计、施工中应注意的若干问题,并作出相应的建议,对设计和施工人员有一定的借鉴意义。
参考词条
补充资料:施工综合进度优化


施工综合进度优化
optimization for overall schedule of construction

shlgong Zonghe jlndU youhuo施工综合进度优化(optimization for overallschedule of eonstruetion)对施工中的相关因素进行多方案比较和优选,找出最佳的进度方案并予以实施的工作。最佳的进度方案应是工期、资源利用、工程造价等方面综合考虑最优的方案。优化的方法包括工期优化法、资源优化法、成本优化法等. 工期优化法在合理利用人力、物力、财力、资源的前提下,尽量缩短关键路径所需的时间。可以采取提高机械化程度等先进施工方法,以及采用近饱和密度的施工组织措施等.近饱和密度的施工,是按流水施工的原理确定工艺参数、空间参数和时间参数,使多工种、多工序相互穿插,紧密衔接,充分利用施工场地,尽量减少施工中的停歇时间,以加快施工进度。 资源优化法在力求减少资源投人的条件下满足工期要求。有两种优化方法:①资源已定,力求工期最短;②工期已定,力求资源投人最少。 成本优化法寻找工程总成本(或工程总造价)最低的最短工期。具体方法是:将工程的直接费(随工期压缩所需增加的机械购置和使用费用、材料费用、临建费等)与工期延长所需增大的间接费进行比较,并计算工程提前投产后的发电效益等诸多因素。优化的结果,使工程成本最低,工期最短。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。