1) coupling beam with slab
带板连梁
1.
The paper also analyze the seismic performance of strength development,stiffness degeneration,hysteretic and energy dissipation behavior of coupling beam with slab.
通过对2个小跨高比新型配筋方案带板连梁与不带板连梁试件在低周反复荷载作用下的对比试验,揭示了整浇楼板对抗震连梁裂缝发育及破坏形态的影响规律,同时分析了带板连梁的强度发展、刚度退化、滞回及耗能性能等抗震特性,根据受力机理探讨了连梁的变形性能,提出了楼板在参与连梁抗剪作用中的有效板宽范围。
2) continuous plate beam
连续板梁
1.
This paper introduces ramp bridge s main construction methods and technical measures with continuous plate beam by a ramp bridge engineering example in expressway circling Ningbo city.
通过宁波绕城高速某匝道桥的工程实例介绍了连续板梁匝道桥的主要施工方法和技术措施,并针对该匝道桥跨小河、变截面等施工难点提出了施工流程,对类似工程顺利施工具有指导意义。
2.
In this article, authors introduce the high-balance synchro swiveling lifting construction of a 100m span continuous plate beam, and components and application of the LSD fluid power lifting system.
介绍跨度为 10 0m的连续板梁高平衡同步转体提升施工 ,LSD液压提升系统的组成及在工程中的应用。
3) slab and girder splice
板梁连接
4) continuous board and beam
连续梁板
1.
The calculation method of continuous board and beam;
连续梁板计算方法的分析
5) strap beam
板带梁
1.
The pre-stressed strap beam on the column the method is proposed.
介绍了大跨双向混凝土现浇空心楼盖的变形控制与工程应用,结合实际工程需要,提出在柱上板带梁施加预应力的方法。
6) steel continmous beam (slab)
钢连续梁(板)
补充资料:板带轧制速度规程(见板带轧制规程设计)
板带轧制速度规程(见板带轧制规程设计)
speed schedule for plate and strip rolling
bandai zhazhi sudu guieheng板带轧制速度规程(speed seheduxe fo:plateand strip rolling)见板带札制规程设计。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条