1) construction of working shaft
工作井施工
2) Downhole Construction
井下作业施工
1.
Influence of Downhole Construction on Environment and Its Treatment;
井下作业施工对环境的影响及治理
4) vertical shaft construction
立井施工
1.
This paper introduces the technology and application of synchronous concentrated control of several steady vehicles in vertical shaft construction, which has solved the dissynchromous consentrated control problem of steady vehicles and achieved great effect in vertical shaft construction.
本文介绍了立井施工中多台稳车同步集中控制技术及其应用,解决了稳车不能同步集中控制的问题,在立井井筒施工方面取得了良好的效果。
2.
Taking the vertical shaft construction of Qianfogou Coal Mine as the example, this paper introduces in detail the technology of slide template, and puts forward some matters needing attention in the construction.
以千佛沟矿排矸立井施工为例,详细介绍了滑动模板筑壁的工艺,提出了施工中的注意事项。
5) open caisson construction
沉井施工
1.
Calculation and analysis of open caisson construction of pumping station for Yuhuan Power Plant;
玉环电厂雨水泵房沉井施工计算和分析
2.
Application of thixotropic slurry to open caisson construction;
触变泥浆在沉井施工中的应用
3.
On the application of the pile block injected reinforcement in the open caisson construction;
浅谈桩顶注浆加固在沉井施工中的应用
6) shaft construction
井筒施工
1.
By the construction practice of pre-reserved beam sump in the shaft construction of Guqiao Coal Mine,goes further into the technical factors and pre-reserved result ect.
通过顾桥矿井筒施工过程中预留梁窝的施工实践,探讨了井筒掘砌中预留梁窝施工的技术因素、预留效果等。
补充资料:承包人要求发包人作好施工前的准备工作的权利
承包人要求发包人作好施工前的准备工作的权利:施工前的准备工作是整个工程建设过程的重要组成部分,是保证工程建设按期开工和保证工程质量的一个重要环节。发包人应当按照合同的约定作好施工前的准备工作,包括:于施工前办妥正式工程和临时设施范围内的土地租用、征用申请施工许可证,爆破及临时铁道专用线接岔许可证;确定建筑物(或构筑物)、道路、线路、上下水道的定位标桩、水准点和坐标控制点;开工前,接通施工现场水源,电源和运输道路,并按约定清除施工现场的障碍物;组织有关单位对施工图等技术资料进行审定,并按约定的时间和份数提供给承包人。合同中约定由发包人提供材料和设备的,发包人应按照约定的范围和时间向承包人提供材料和设备。根据《合同法》第283条规定,发包人未按照约定时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期。并有权要求赔偿停工、窝工等损失。----------出自《合同法》第283条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条