1) vertically integrated consumption
纵向集成消耗
2) Lengthways Integration
纵向集成
3) accumulation cost
集结消耗
1.
To calculate the accumulation cost of a BCT(block container train),the theory of stochastic process was used to study the number containers of a BCT,as well as the number of arrival containers and arrival intervals in accumulation processes.
为了确定铁路集装箱班列的集结消耗,运用随机过程的理论,研究集装箱班列的编成箱数和集结过程中涉及到的到达箱数、到达间隔,并对到达强度进行了参数估计。
4) Exclusion-Enrichment
消耗-富集
5) general longitudinal demagnetization
纵向消磁
6) construction cost
建成消耗
1.
Comparison of leaf construction cost in dominant tree species of the evergreen broad-leaved forest in Jiulian Mountain, Jiangxi Province;
江西九连山常绿阔叶林主要树种叶建成消耗的比较
补充资料:L2工业纯铝360℃热轧板中心区域纵向组织
L2工业纯铝360℃热轧板中心区域纵向组织
L2工业纯铝560。0热轧板中心区域纵向组织
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条