2) main points of construction technology
施工技术要点
1.
From the laboratory test results and the study,this article put forward to main points of construction technology for asphalt mixture mixed with polyester fiber.
通过室内试验,对掺聚酯纤维沥青混合料的路用性能进行研究,并提出掺聚酯纤维沥青混合料的施工技术要点。
3) special constructional technique
特殊施工技术
1.
This papre summarizes the progress for special constructional technique of underground engineering in complex stratum.
介绍复杂地层中地下工程特殊施工技术的进展和研究状况。
4) construction character
施工特点
1.
From the versus analysis, it illustrates the suitable conditions,construction characters,work efficiency,seepage proof wall body character and the economical efficiency of these construction method.
主要论述了垂直防渗墙施工的几种新技术,通过对比分析说明了这几种施工方法的适用条件、施工特点及工效、防渗墙墙体特点和该工法的经济性。
5) construction characteristics
施工特点
1.
And this paper recommends the design way for the mix of the lean concrete,then researched and discussed the construction characteristics of the lean concrete,in order to improve the quality of lean concrete base course and promote the application of lean concrete base course.
简单介绍了贫混凝土基层的特点,对贫混凝土基层的材料要求进行了说明,并介绍了贫混凝土基层的配合比设计方法,对其施工特点进行了研究探讨,以提高贫混凝土基层的质量,推广贫混凝土基层的应用。
2.
Through setting forth the meaning of municipal engineering and combining with the prsent conditions, the article puts forward the contents included in the municipal engineering and the construction characteristics.
通过对市政工程含义的阐述,结合当前的现实情况,提出了市政工程所包含的内容及施工特点。
3.
In order to ensure the construction quality of grouting, an effective supervisory management system was established and effective measures for supervisory control were formulated in accordance with the construction characteristics, environment factors and technologic requirements of the joi.
为了保证灌浆施工质量,针对接缝灌浆的施工特点、环境因素、技术要求,建立了行之有效的监理管理体系,制定了有效的监理控制措施。
6) construction feature
施工特点
1.
The construction feature and course of the Zuojiang multi-purpose dam project;
左江水利枢纽工程施工特点及建设历程
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条