2) turned out slab pile
板坯倒垛
1.
The optimal turned out slab pile (TOSP) problem is to determine N slabs from M related pile locations so that the total turned out slab pile number can be minimized while the.
最优倒垛问题是如何从 M个相关的板坯垛位中选择 N个板坯 ,在满足相应的轧制单元计划所需要的板坯序列要求的条件下 ,保证总的板坯倒垛次数最少 。
3) shifting
[英][ʃift] [美][ʃɪft]
移泊;倒垛
4) turned-out slab stack
倒垛问题
1.
According to the turned-out slab stack problem in warehouse logistics system,a deep analysis was made.
针对仓储物流中常常遇到的倒垛问题进行了分析,建立了0-1非线性整数规划模型,根据模型特点将其归结为具有问题特征的可扩展广义指派问题,该问题具有NP-难的性质,因此获得较大规模最优解是不可能的或是非常困难的。
6) stacking
[英][stæk] [美][stæk]
堆垛
1.
The Design of Carbon block Stacking Crane;
碳块堆垛天车的夹具设计
2.
The full-scale experimental method is used to study the characteristics and behaviors of fire and flame development of the simulated standard component of electrical household appliance in different rack and stacking forms unprotected by sprinklers.
采用实尺实验的方法,针对模拟家电类商品的标准组件,就商品货架摆放和堆垛摆放的不同形式,研究在无水喷淋保护的条件下火灾发展和火焰传播的特性。
3.
To handle the separating, cutting and stacking problems in production of playing card in China, pipelining mode involving auto separation with discal blade, auto-stacking with stacking framework was adopted distinct from traditional mode of punching separating, manual neatening and stacking.
针对国内扑克牌生产中的印后分切、堆垛问题,大胆突破国内原有的冲压分切、人工整理堆垛的生产模式,改为圆盘刀自动分切、堆垛机构自动堆垛的流水线生产模式,研制了扑克牌自动分切机。