1) up-crossing rate
超越率
1.
) was used firstly to map a non-Gaussian structural response into a standard Gaussian process,then mean up-crossing rates,mean clump size and the initial passage probability of a critical barrier level by the original structural response were estimated.
然后,利用变换的标准Gauss过程计算原结构反应过程关于某临界界限的平均超越率、平均群超尺度和初始超越概率。
2.
) are used to map a non-Gaussian structural response into a standard Gaussian process,and then the mean up-crossing rate of the original response process for a critical level is estimated from the mapped standard Gaussian proce.
该方法利用Hermite矩模型将非高斯结构反应映射为标准高斯过程,由此计算反应的平均超越率、成群超越以及初始状态的影响,并最终给出结构的首次失效时间概率。
2) transcendental probability
超越概率
1.
The corresponding coefficient of deviation mean Φp and transcendental probability P are evaluated under different skewness coefficient Cs by deducing Pearson Type Ⅲ probability density distribution function according to the requirement of Military Specification Airplane Strength and Rigidity.
本文按军用飞机强度和刚度规范中规定的要求,通过对皮尔逊Ⅲ型概率密度分布函数的推导,完成了在不同偏态系数Cs下的离均系数Φp和超越概率P的对应数值编程计算,并得到了相应的计算结果。
2.
The paper calculates and analyzes the issue by using two methods of transcendental probability and the effective service life of project.
采用超越概率和工程有效服务年数两种方法计算分析,结果表明:8万座小型水库在40~50年内因洪水超标准而垮坝的有297座,其相应的防洪标准为10 000~13 000年一遇。
3) exceeding probability
超越概率
1.
In this paper,the equal exceeding probabilityprinciple is carried out to determine the characteristic value、statistica parameters of variable load.
为了研究60年基准期下的可变荷载取值标准,采用了60年基准期下的荷载超越概率与现行规范50年基准期下荷载超越概率一致的原则,对建筑结构60年基准期的可变荷载标准进行了具体研究,最终给出楼面活荷载、风荷载和雪荷载的相应结论。
5) higher efficiency
效率超越
1.
The success of competition can be gained,besides by promoting the essential competitiveness and gaining distinction,by avoiding the competitive front and achieving higher efficiency.
竞争取胜之道除了提高核心竞争力 ,显露独特优势以外 ,还可以弱化竞争环境 ,实现效率超越。
6) Annual exceeding probability
年超越概率
补充资料:电导率(见电阻率)
电导率(见电阻率)
conductivity
d!日nd日O}已电导率(eonduetivity)见电阻率。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条