说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 动车联调试验站
1)  combined regutation test station for motor car
动车联调试验站
2)  united test
联调试验
1.
By using LabWindows/CVI and Visual FoxPro database,a united test-bed based on ODBC techniques for Fly-By-Wire(FBW) control system of a plane has been designed.
基于windows平台实现LabWindows/CVI和Visual FoxPro数据库之间的数据共享,研制了某型飞机电传操纵系统联调试验台,给出了系统的硬件构成及软件实现方法。
3)  linkage trial run
联动试车
1.
Taking a large-scale municipal wastewater treatment plant in a provincial capital of south China,with treatment capacity of 40×104 m3/d and A/A/O process as example,the paper summarizes the supervision experience in linkage trial run and process commissioning.
以我国南方某省会城市1座处理能力为40×104m3/d、采用A/A/O典型工艺的大型污水处理厂为例,从调试阶段必须具备的条件及监理工作的内容等方面,总结了污水处理厂联动试车过程的监理实施经验。
4)  vehicular engine testing and adjusting
车辆发动机试验和调整
5)  power testing locomotive
动力试验车
1.
Development and application of the wireless picture transmission and control system of power testing locomotive;
动力试验车图像无线传输控制系统的开发应用
6)  floating-test-car
浮动试验车
补充资料:CESI网络试验站
      世界著名的强电流断流试验站(见图)。全名为意大利中央电工研究所网络试验站。位于意大利北部米兰。1958年兴建。网络试验站通过变电所的输电线路将电流送至试验站的短路变压器,再经过限流电抗器和保护、合闸间开关进行试验。除了没有冲击发电机外,其他设施与断流容量试验站一样。CESI网络试验站引二回路220千伏线路至试验站,其试验用短路变压器为3台220/4×15kV、4×10kV;试验容量1964年已达8000MVA,到1980年后增大为30000MVA;最大电流为150kA。
  
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条