2) dam slope stability
坝坡稳定
1.
Seepage and its effect on dam slope stability in Wuling Hydraulic project;
吴岭水库大坝渗流及对坝坡稳定影响的分析
2.
Water level in small flood control in combination with irrigotion reservoir changes frequently,especially during irrigation period,the reservoir water level drops significantly,which would affect the dam slope stability.
本文结合具体算例阐述了库区水位降落时降落深度和降落速度两个因素对坝坡稳定性的影响。
3.
Based on the dam slope stability calculation conducted for a high core wall type rockfill dam with linear strength index and nonlinear strength index respectively,the authors discuss the difference of the calculation results.
对某高心墙堆石坝分别利用线性强度指标及非线性强度指标进行了坝坡稳定性计算分析,研究了两种强度指标下坝坡稳定性的差异。
3) slope stability
坝坡稳定
1.
At present,it is not perfect to analyze the slope stability of rockfill dam only using traditional safety factors method.
以可靠度理论为基础,对堆石坝坝坡稳定性可靠度的原理与方法进行了分析研究,同时编制了相应的程序。
2.
It is indicated by calculation of seepage flow and analysis of slope stability that the tailing pond can meet the environmental protection requirement after the control and reinforcing measures are taken in design.
经渗流及坝坡稳定等分析计算,表明设计采取的整治加固措施具有较好的效果,满足尾矿库安全要求。
3.
In addition the influences of nonlinear strength parameters φ0 and Δφ on slope stability were researched.
针对高堆石坝非线性强度指标坝坡稳定可靠度分析方法与参数敏感性等关键问题,提出了数值微分技术与FORM相结合的新方法,解决了功能函数为隐函数的可靠度计算问题,并深入研究了非线性强度指标φ0、Δφ对坝坡稳定的影响程度。
6) abutment stability
坝肩稳定
1.
Analysis on the reliability of the arch dam abutment stability based on stochastic finite element;
基于随机有限元的拱坝坝肩稳定可靠度分析
2.
In Connection with three dimensional geomechanical model testing for Shapai RCC arch dam abutment stability study,this paper mainly analyses the differences & similarities between the test results of the synthetical method & overloading method as well as applicability of these test results.
结合沙牌RCC拱坝坝肩稳定三维地质力学模型试验,着重分析了综合法与超载法所得试验成果的异同及其成果的实用性,探讨了由两种试验方法求得的安全系数间的相互关系。
3.
Combined with the three dimensions geological mechanics model experiment of the abutment stability of Sichuan Shapai RCC arch dam, the differences and similarities between the test results of Synthetical Measure and Over-loading as well as the possibility of application there of were emphatically analycised in the article.
本文结合四川沙牌RCC拱坝坝肩稳定三维地质力学模型试验,着重分析了由综合法与超载法所得试验成果的异同点及其成果的适用性,探讨了由两种试验方法求得的安全系数间的相互关系,提出了采用何种试验结果作为确定工程加固处理范围的依据等结
补充资料:稳定/稳定浴
分子式:
CAS号:
性质:照相中的稳定作用是指防止感光材料在保存过程中由于药膜中残留药液的作用而引起的暗褪色、色污染及霉变等弊病。通过正常冲洗或无水洗加工最后一个工序——稳定工序,可稳定照相影像,使之不变或变化极小。能起稳定作用的浴液称稳定浴。无水加工中的稳定浴主要由pH值控制剂、铁隐蔽剂、防霉剂、坚膜剂、软水剂、有机助剂等组成。
CAS号:
性质:照相中的稳定作用是指防止感光材料在保存过程中由于药膜中残留药液的作用而引起的暗褪色、色污染及霉变等弊病。通过正常冲洗或无水洗加工最后一个工序——稳定工序,可稳定照相影像,使之不变或变化极小。能起稳定作用的浴液称稳定浴。无水加工中的稳定浴主要由pH值控制剂、铁隐蔽剂、防霉剂、坚膜剂、软水剂、有机助剂等组成。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条