说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 钢管砼
1)  concrete filled steel tube
钢管砼
1.
The lateral pressure effect coefficient and the confinable effect coefficient of the concrete filled steel tube are analyzed theoretically.
钢管砼侧压效应系数及约束效应系数进行了理论分析 ,建立了二者的关系 并提出了能有效限制核心砼横向变形的约束效应系数的范
2.
Considering geometric nonlinearation of the bridge during construction,structural behavior of the concrete filled steel tube stiff skeleton of Jinhe bridge over Yalong River in Yanyuan with a span of 170m is analyzed,with the aid of the mixed structure model with the shell,truss and beam member using finite element method.
以盐源金河雅砻江大桥 170m跨径的钢管砼劲性骨架在施工过程中的结构计算为研究对象 ,考虑几何非线性 ,采用平壳 -桁 -梁组合结构的空间有限元分析模型 ,探讨了拱肋砼浇筑过程对结构内力、变形及稳定性的影
2)  CFST
钢管砼
1.
Limit Bending Moment Analysis of CFST Member of Circular Section;
圆截面钢管砼构件极限弯矩分析
2.
Study on Creep Effect of Eccentrically Compressed CFST Members;
钢管砼偏心受压构件的徐变分析
3.
A inquiry on creep effect reseach of CFST member;
钢管砼结构徐变效应研究的探讨
3)  steel pipe concrete
钢管砼
1.
construction technique of the steel pipe concrete construction pillar;
钢管砼结构柱的施工技术
2.
Analysis is made on the structure of the space truss compound girder made from steel pipe concrete, and given directly the potential development.
介绍了钢管砼空间桁架组合梁式结构型式,通过分析它的受力特点,大胆预测了这种新型结构型式的广阔发展前景。
4)  concrete-filled steel tube
钢管砼
1.
A constitutive relationship of core-concrete which suits to the big diameter concrete-filled steel tube was set forth through some widely applicable models as well as the methods of experiments and numerical analysis.
对现有的钢管砼中核心砼的本构模型进行了数值分析;通过不同直径试件的轴压试验,分析了直径大小对模型的影响,得到了适合于大直径钢管砼的核心砼本构关系。
5)  concrete filled steel tubular
钢管砼
1.
Minxuan Bridge is a three-span arch bridge with main span(90m) of half-through concrete filled steel tubular rib arch and two side spans(48m) of reinforced concrete rib arches, not only beautiful but also a solution for the unbalance thrust of dead load.
铭选大桥为三跨拱桥,主孔为净跨90m的钢管砼中承式肋拱,两边跨为静跨48m钢筋砼上承式肋拱,不但造型美观,而且解决了恒载不平衡推力问题。
6)  concrete filled steel tubular column
钢管砼柱
1.
This article describes the key construction technology and quality control of concrete filled steel tubular column of certain high rise building.
介绍高层建筑钢管砼柱的关键施工技术和质量控制方法 ,包括钢管柱的制作、组焊、安装、混凝土浇筑、坍落度调整、高位抛落并振捣的方法及钢管砼柱的质量检查方法
2.
The fire behaviors of six concrete filled steel tubular columns insulated using cement mortar with a thickness of 50mm were tested under ISO834 standard fire.
根据 ISO834标准升温条件,开展了六根采用水泥砂浆防火保护层(厚度50mm)的钢管砼柱的耐火性能试验研究。
补充资料:宝鸡石油钢管厂大口径薄壁钢管的φ508排辊成形机组


宝鸡石油钢管厂大口径薄壁钢管的φ508排辊成形机组


  宝鸡石油钢管厂大口径薄壁钢管的中508排辊成形机组
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条