1)  steel boxed cofferdam
钢套箱围堰
1.
57 of the 2nd Hanjiang River Bridge on the middle section of Suizhou-Yueyang Expressway,using the double-wall steel boxed cofferdam under condition that the construction time schedule for the pier was short,the river water conditions were complicated and water pressure on the pile cap construction was great.
介绍随岳中高速汉江二桥57号主墩,在施工周期短、水况复杂、承台施工水头大的条件下,利用双壁钢套箱围堰进行设计与施工的全过程。
2.
This paper deals with the construction methods for fabricating and assembling on land,launching,floating,positioning and sinking in integrity in river the huge steel boxed cofferdam for Pier No.
介绍南京大胜关长江大桥主桥6号墩大型钢套箱围堰岸上制造拼装、滑移下水、浮运定位、整体下沉的施工方法。
3.
25 m in width and 6 m in depth and the pile cap is constructed by the steel boxed cofferdam.
25 m,承台厚6 m,采用钢套箱围堰施工。
2)  single-wall steel boxed cofferdam
单壁钢套箱围堰
1.
Parts of the foundations of the Bridge are of the low-lying pile caps located in the shallow sea area and some of the pile caps in the relatively deep water in the sea area are constructed by the single-wall steel boxed cofferdams.
温福铁路宁德特大桥位于宁德海湾,桥梁基础为浅海区低桩承台,浅海区深水承台采用单壁钢套箱围堰进行施工。
3)  slip jacket cofferdam
套箱围堰
4)  lock-type steel boxed cofferdam
锁口式钢套箱围堰
1.
The lock-type steel boxed cofferdam combines advantages of traditional steel boxed cofferdam and steel sheet piles cofferdam to make good results of easy assemble and installation of the bridge, precise location,good stability and less investment of machine.
锁口式钢套箱围堰综合了传统钢套箱围堰与钢板桩围堰的优点,使得拼装及安装简便,定位控制精确、稳定性好、机械设备投入少。
5)  suspended steel box cofferdam
钢吊箱围堰
1.
The construction simulation analysis for suspended steel box cofferdam;
钢吊箱围堰施工仿真分析
2.
Construction technique and method of suspended steel box cofferdam are introduced in conjunction with the construction of Anqing Highway Bridge over Yangtze River.
钢吊箱围堰以其诸多优点在大型桥梁施工中得到了广泛应用。
6)  steel boxed cofferdam
钢吊箱围堰
1.
This paper deals with the construction techniques for launching of the bottom tier of the huge steel boxed cofferdam for Pier No.
介绍南京大胜关长江大桥7号墩底节钢吊箱围堰下水施工技术。
2.
At present, steel boxed cofferdam has applied in the construction of high pile cap in deep water widely.
钢吊箱围堰目前已被广泛应用于深水高桩承台施工中。
补充资料:45钢和40Cr钢调质的热处理工艺
45钢40Cr钢调质                         
    调质是淬火加高温回火的双重热处理,其目的是使工件具有良好的综合机械性能。
    调质钢有碳素调质钢和合金调质钢二大类,不管是碳钢还是合金钢,其含碳量控制比较严格。如果含碳量过高,调质后工件的强度虽高,但韧性不够,如含碳量过低,韧性提高而强度不足。为使调质件得到好的综合性能,一般含碳量控制在0.30~0.50%。

    调质淬火时,要求工件整个截面淬透,使工件得到以细针状淬火马氏体为主的显微组织。通过高温回火,得到以均匀回火索氏体为主的显微组织。小型工厂不可能每炉搞金相分析,一般只作硬度测试,这就是说,淬火后的硬度必须达到该材料的淬火硬度,回火后硬度按图要求来检查。 

工件调质处理的操作,必须严格按工艺文件执行,我们只是对操作过程中如何实施工艺提些看法。


   1、 45钢的调质
   45钢是中碳结构钢,冷热加工性能都不错,机械性能较好,且价格低、来源广,所以应用广泛。它的最大弱点是淬透性低,截面尺寸大和要求比较高的工件不宜采用。


   45钢淬火温度在A3+(30~50) ℃,在实际操作中,一般是取上限的。偏高的淬火温度可以使工件加热速度加快,表面氧化减少,且能提高工效。为使工件的奥氏体均匀化,就需要足够的保温时间。如果实际装炉量大,就需适当延长保温时间。不然,可能会出现因加热不均匀造成硬度不足的现象。但保温时间过长,也会也出现晶粒粗大,氧化脱碳严重的弊病,影响淬火质量。我们认为,如装炉量大于工艺文件的规定,加热保温时间需延长1/5。


   因为45钢淬透性低,故应采用冷却速度大的10%盐水溶液。工件入水后,应该淬透,但不是冷透,如果工件在盐水中冷透,就有可能使工件开裂,这是因为当工件冷却到180℃左右时,奥氏体迅速转变为马氏体造成过大的组织应力所致。因此,当淬火工件快冷到该温度区域,就应采取缓冷的方法。由于出水温度难以掌握,须凭经验操作,当水中的工件抖动停止,即可出水空冷(如能油冷更好)。另外,工件入水宜动不宜静,应按照工件的几何形状,作规则运动。静止的冷却介质加上静止的工件,导致硬度不均匀,应力不均匀而使工件变形大,甚至开裂。