1) temporary structure
临时结构
1.
In this paper,the internal forces of prestressed concrett continuous beam at thrusting construction stage are analyed,the stress variation on the main sections of the beam is discussed,and the method of design and calculation for temporary structure is introduced.
对顶推施工过程中的内力进行了分析,讨论了主要截面的应力变化情况;全面介绍了临时结构的设计计算。
2) temporary fixed construction
临时固结构造
1.
By construction simulation analysis of main girders of concrete cable-stayed bridges with current temporary fixed constructions,the cause was obtained that cracks often take place in the temporary fixed area of main girders.
通过对目前采用塔梁临时固结构造施工的混凝土斜拉桥主梁进行施工仿真分析,对临时固结处主梁容易开裂的原因进行了分析并对临时固结构造提出了改进建议,可供工程人员参考。
3) temporary structural supporting
结构临时支撑
4) temporary supporting structure
临时支护结构
5) temporary construction structure
施工临时结构
1.
As a temporary construction structure, construction platform means critical importance to construction operation of deep-water pier in the construction process, construction platform of steel guide-well avail of steel guide-well as brace system in the second Danjiangkou Bridge.
作为施工临时结构的施工平台对深水墩施工的进行有着至关重要的作用。
6) large temporary support structure
大型临时支撑结构
补充资料:关于临时建设和临时用地
临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条