1) Shahe Pumped-storage Power Station
沙河抽水蓄能电站
1.
Analysis of the Operation Defects of the Units of Shahe Pumped-storage Power Station;
沙河抽水蓄能电站机组运行缺陷浅析
2.
Optimization of Non-electricity Protection for Shahe Pumped-storage Power Station;
沙河抽水蓄能电站非电气量保护的优化
3.
Modification of Water Supply System for Shahe Pumped-storage Power Station;
沙河抽水蓄能电站机组技术供水系统改造
2) Shahe Pumped-storage Power Plant
沙河抽水蓄能电站
1.
Operation and dispatching of the lower reservoir of Shahe Pumped-storage Power Plant;
沙河抽水蓄能电站下水库运行调度
2.
Analysis of causes of upper guiding bearing burning accident in the No.2 unit of Shahe Pumped-storage Power Plant;
沙河抽水蓄能电站2号机上导瓦烧损事故分析
3.
Analysis and treatment of the defects exposed in commercial operation of Shahe Pumped-storage Power Plant;
沙河抽水蓄能电站机组运行缺陷分析及处理
3) ShaHe Pumped Storage Power Station
沙河抽水蓄能电站
1.
The Humanistic Management of ShaHe Pumped Storage Power Station;
沙河抽水蓄能电站的人本管理
2.
The facing slab of the east subdam of Shahe Pumped Storage Power Station moved up so that cracks occurred during construction period due to seepage uplift.
沙河抽水蓄能电站东副坝在施工过程中由于面板受反向渗水顶托而抬动并产生裂缝。
4) Jiangsu Shahe Pumped-storage Power Plant
沙河抽水蓄能电站
1.
Jiangsu Shahe Pumped-storage Power Plant has its powerhouse s lower part laid in a shaft that is lined with reinforced concrete and 29 m in diameter and 38 m in depth.
江苏沙河抽水蓄能电站厂房采用竖井半地下式布置,竖井直径为29m,深38m,采用混凝土衬砌。
5) Pushihe pumped-storage power station
蒲石河抽水蓄能电站
1.
Study on model test similar constant of prestressed pier in Pushihe pumped-storage power station;
蒲石河抽水蓄能电站预应力闸墩模型试验相似常数研究
6) Bailianhe pumped-storage power station
白莲河抽水蓄能电站
1.
The project layout, selection of main parameters of Bailianhe pumped-storage power station are described, and the main parameters of riversible pump-turbine aggregate are recommended.
介绍了湖北省白莲河抽水蓄能电站工程概况、基本参数和枢纽布置等 ,提出了白莲河抽水蓄能电站可逆式机组机型参数推荐
补充资料:巴斯康蒂抽水蓄能电站
巴斯康蒂抽水蓄能电站 Bath County Pumped Storage Power Station 位于美国弗吉尼亚州西北部,20世纪80年代是世界上装机容量最大的抽水蓄能电站。装机容量210万千瓦。厂房为半地下式,发电设计水头329米,抽水设计扬程335米,抽水最大流量 116米3/秒。上水库土石坝最大坝高140米 ,坝顶长731米。总库容4400万米3。下水库土石坝最大坝高41米,坝顶长690米,总库容3760万米 3。引水系统包括岸坡式取水口、引水平洞、竖井、压力隧洞、压力钢管和调压井等 。工程于1975年开工,1985年投产。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条