1) immersible embankment
浸水路堤
1.
Finite element analysis of stability of immersible embankment;
浸水路堤稳定性有限元分析
2) soaking rock-fill embankment
浸水填石路堤
3) permeable embankment
透水路堤
1.
Combined with the practice of permeable embankment,the paper discussed the construction methods and its materials technical requirements of permeable embankment for reference.
通过透水路堤的工程实践,探讨了透水路堤的施工方法和透水路堤材料的技术要求,并提出质量控制具体措施,达到了预期的目的。
4) channel embankment
水路堤
5) soak path
浸水路径
1.
The uniaxial compression test was carried out on undisturbed Q_3 loess,and the influence of different pressure directions and soak paths on the deformation characteristics of collapsible loess were analyzed.
通过对原状Q3黄土进行单轴压缩试验,分析了不同加载方向和浸水路径对湿陷性黄土变形特性的影响,讨论了湿陷性黄土变形的各向异性以及增(减)湿过程中变形与浸水路径的无关性。
6) flooding pipe line
浸水管路
补充资料:浸水
1.灌溉之水。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条