1) surveying setting-out
测量放线
1.
On the way to do surveying setting-out for large rockery engineering;
大型假山工程测量放线的浅析
2.
Combined with general situation and geologic condition of a certain project, the author introduces the measures to ensure engineering quality from surveying setting-out, data processing and the implement of relevant systems, illustrates measures of construction quality control, and checks out its construction results, which is fit for the design requirement.
结合某工程的概况和地质条件,从测量放线、资料整理、有关制度的执行等方面介绍了工程的质量保证措施,阐述了施工质量控制措施,并对其施工结果作了检验,显示满足设计要求。
2) setting-out
测量放线
1.
The Lüzhou Zhonghuan Center project has characteristics such as large area,multiple buildings,high main building,many circle center and arc with different radius,difficulty setting-out.
绿洲中环中心工程占地面积大、幢数多、主楼高度高,平面由多个不同圆心、不同半径圆弧组成,测量放线难度高。
3) measurement and setting out
测量放线
1.
It makes an analysis of the quality problems commonly met in drainage pipe project construction from nine links including pipe purchase,measurement and setting out,trench excavation,pipe base on the flattened foundation,pipe installation,joint,inspection chamber sealing experiment,backfilled soil,etc.
从排水管道工程施工中的管材采购、测量放线、沟槽开挖、平基管座、安管、接口检查井闭水试验、回填土等9个环节,对排水管道工程施工中常见的质量问题进行了分析,并提出了相应的质量控制措施。
5) The diagraph puts a line technique
测量放线技术
6) kinds of location surveying
测量放线工种
补充资料:放线验线应注意哪些事项
放线验线时应注意以下五点注意事项:
1、先放线后验线。应当坚持先放线后验线的程序。一般建设工程项目可按照周围的参照物,由施工单位放线,施工放线后,建设单位向城市规划行政主管部门申请验线并报形式日期,城市规划行政主管部门的管理人员到现场验门的勘测队伍进行放线,放线后经规划管理人员验线。
2、作好放线验线记录。无论由谁放线、验线、都必须作好放线、验线记录。
3、在放线的过程中,对验线时需要查验的关键点必须打上固定标志。
4、放线时,原地上需要拆除的建筑物、构筑物应当全部拆除掉。
5、地形复杂的用地,应平整后再放线。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。