1) buried culvert
暗涵
1.
Monitoring on construction of buried culvert under West No.4 Ring Road in Beijing for South-to-North Water Transfer Project;
南水北调北京西四环暗涵工程施工期监测
2) buried derivation culvert
引水暗涵
1.
Connecting with the technical requirements of second lined concrete construction of the buried derivation culvert in the Fourth Loop of Beijing of the middle route of South-to-North Water Diversion Project, this paper sums up and analyzes the application of trace trolley formwork in the buried derivation culvert of the middle route of South-to-North Water Diversion Project.
结合南水北调中线工程北京西四环引水暗涵工程二衬混凝土施工中的技术要求,就轨道台车模板施工技术在暗涵二衬混凝土施工中的应用进行了总结和分析。
3) buried culvert
暗涵工程
1.
Analysis on effect of groundwater on design of buried culvert under West No.4 Ring Road in Beijing for Mid-route of South-to-North Water Transfer Project
地下水对南水北调中线西四环暗涵工程设计的影响分析
4) culvert tunnel
暗涵隧道
5) the buried culvert under the West Fourth Ring road
西四环暗涵
1.
This paper explains the timbering opportunity of second liner of the buried culvert under the west fourth ring road not only influences the security of the buried culvert, the west fourth ring road and surrounding structures, but also the quality of second liner timbering, the construction period and project cost.
西四环暗涵浅埋暗挖隧洞二衬支护何时施做,关系到西四环暗涵工程、西四环路及周边建筑物安全,并对二衬支护质量、施工周期、工程造价有较大影响,对该课题进行了阐述。
6) Double chamber culvert
双箱式暗涵
补充资料:涵涵
1.水波晃动貌。 2.雄浑自然貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条