1) conductor configuration
导线排列
2) compact conductor configuration
紧凑型导线排列
3) lead arrangement mode
导线排列方式
1.
The selection of lead arrangement mode,the analysis of lightning protection performance and optimization of tower structure in the typical design were discussed emphatically,and the synthetically economic and technical target of the designed steel tower were compared and analyzed.
重点讨论了铁塔典型设计中导线排列方式选择、防雷性能分析、铁塔结构优化等3个方面的设计问题,比较分析了该典型设计铁塔的综合技术经济指标。
4) horizon phase conductors model
相导线水平排列
1.
For choosing the optimum audible noise predicting formulas from several existing ones, and to meet China\'s requirements of voltage level and bundle conductor, the calculation and the measurement is compared in horizon phase conductors model and triangle phase conductors one.
结果表明:相导线水平排列大雨时可用ENEL公式或IREQ公式计算,小雨时可用ENEL或GE公式计算;相导线正三角排列大雨时可用ENEL公式或BPA公式计算,小雨时只有BPA公式最适合。
5) triangle phase conductors model
相导线三角排列
6) conductor configuration
配线,布线,导线排列
补充资料:等级排列法
等级排列法
ranking method
等级排列法(ranking method)制作顺序量表的一种方法。具体作法是将许多刺激同时向被试呈现,要求他按照规定的刺激属性,把这些刺激从大到小排出一个顺序。若许多被试每人都排出一个顺序,那么就可以每一刺激的各人评定的等级的平均数,作为这一刺激的平均等级。最后按每一刺激的平均等级从大到小排出一个次序。这个次序就是一个顺序量表 (金志成撰林仲贤审)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条