说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 造价咨询
1)  cost consultation
造价咨询
1.
Health development of the project cost consultation;
工程造价咨询行业的健康发展
2.
In this paper, the importance of the contract in builds design, invites bids, construction, manage and cost consultation to control the invest and the detail that should be noticed in signing contracts were introduced from strengthen contract managemen
本文从加强合同管理角度,介绍工程设计、招标、施工、监理、造价咨询合同对建设项目投资控制的重要性以及签订合同中应当注意的细节。
3.
In this article, the speciality of construction engineering cost consultation competition is anylyzed and discussed, and it helps us to lead the competition into a healthy and upstanding developmental orbit.
本文旨在剖析建设工程造价咨询行业竞争特性,引导该行业迈入健康、良性的竞争轨道。
2)  cost consulting
造价咨询
1.
Through the analysis of the Shanghai local regulation Construction Cost Consulting Standard, the article points out that the implement of the standard not only resolves the open questions but also has great significance to promote the development of the cost consulting industry.
文章通过对上海市《建设工程造价咨询规范》的分析,指出该规范的实施,不仅可以解决现阶段我国工程造价咨询中存在的问题,而且对推动造价行业的发展有着重要影响。
3)  project cost consulting item
造价咨询业
1.
Study on management method of project cost consulting item in our country;
我国工程造价咨询业发展对策研究
4)  cost consulting organ
造价咨询机构
1.
Measures to strengthen self building of railway engineering cost consulting organs;
铁路工程造价咨询机构加强自身建设的措施
5)  engineering cost consultation
工程造价咨询
1.
Study on the Competitive Strategy of Shandong Ruihua Engineering Cost Consultation Co.,Ltd.;
山东瑞华工程造价咨询有限公司竞争战略研究
2.
A relatively exhaustive discussion is made on the present situation and existential problems of ranks establishment for engineering cost consultation and how to perfect this ranks establishment in our country; the proposals of quickening structural reforms for engineering cost management are put forward.
从目前我国工程造价咨询队伍建设的现状、存在问题和如何完善工程造价咨询队伍建设的角度进行了较为详细的论述,提出了加快工程造价管理体制改革的建议。
6)  construction cost consultation
工程造价咨询
1.
Some countermeasures are put forward for the application of duty liability insurance in construction cost consultation in China.
本文简要地介绍了工程造价咨询专业及职业责任保险 ,从该专业发展前景的角度分析了工程造价咨询职业责任保险的需求基础和意义 ,并提出了实施我国工程造价咨询职业责任保险的一些对策。
补充资料:发电工程造价


发电工程造价
power project construction cost

fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条