1) accumulative costdistance
累积耗费距离
2) accumulative cost distance model
累积耗费距离模型
3) distance accumulation
距离累积
1.
A new point-to-chord distance accumulation for searching negative curvature minimum points of the parts contour curve was proposed, and the contour was decomposed by the negative curvature minimum points combined the short-cut rule.
提出了一种新的基于点到弦的距离累积算法,以实现零件轮廓曲线上负曲率极值点的检测,并在此基础上利用短切规则实现目标轮廓的分解与特征参数的提取。
4) cost grid
耗费距离栅格
5) accumulative cost resistance surface
累积耗费阻力表面
6) Integration loss
积累损耗
补充资料:耗费
消耗:~时间丨~人力物力。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条