3) Cableless drain pipe cleaning robot
无缆式管道清淤机器人
4) hole tube tower system to drain silt
孔管塔清淤
5) sediment flushing
防淤清淤
1.
A conceptual model for TGP upstream approaching channel is designed with variable distortion ratios,to study the flow pattern and sediment flushing efficiency by unsteady flow in the TGP upstream approaching channel.
该文采用具有不同变态率的概化河工模型,研究了三峡枢纽上游引航道非恒定冲沙水流的流态和冲沙效果,评价了现有防淤清淤措施的效果,探讨了非恒定流冲沙中的时间变态问题的修正方法。
6) sedimentation releasing and de silting
清淤减淤
补充资料:管道SCADA(见管道数据采集与监控系统)
管道SCADA(见管道数据采集与监控系统)
popeline supervisory control and data acquisition system
管道SCADA(PIPelinesuPervisory eontroland data aequisition system)与监控系统。见管道数据采集
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条