1)  timber-frame structure
木框架结构
2)  Timber frame
木框
3)  wood truss
木框架
1.
Comparison of the yield load and extreme load between strengthened and unstrengthened wood truss is made and the best method to strengthen wood truss is put forward which lays a foundation for the analysis of seismic behavior of wood column and beam-adobe composite wall using finite element software ANSYS.
0对单调水平荷载作用下一榀门式木框架及其各种加固方案进行了静力弹塑性计算分析。
4)  umiak
木框皮舟
5)  warpingframe
整经木框架
6)  wood shear wall
木框架剪力墙
1.
Effect of variable upper stiffness on the performance of wood shear walls;
不同上部刚度对木框架剪力墙受力性能影响的试验研究
2.
This paper introduces the overseas test research results of wood shear walls from 1980s to present.
文章综述了国外20世纪80年代以来的木框架剪力墙的试验研究成果,这些研究成果为我国发展木结构建筑提供了不可多得的借鉴。
参考词条
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。